Strategic Deployment of Chemical Systems in Petroleum Development Oman

机译:阿曼石油开发中化学系统的战略部署

获取原文
获取原文并翻译 | 示例

摘要

Over 85% of Petroleum Development Oman (PDO) production is water and without action, this may increase to 95% by 2012. In 2004, a Chemical Profile Control (CPC) team was launched to coordinate a 2-year trial deployment of chemical water-shut-off technologies across the company. The aim being to reduce unwanted water or gas ingress for the purpose of improving oil or gas production while securing target recovery. The deployment of chemical systems is adversely affected by four major challenges, namely; (1) limited know-how, especially of petroleum engineers & well engineers, (2) lack of multidisciplinary approach to candidate & chemical selection, (3) proof of concept before deployment and, (4) definition & measurement of success. To tackle this problem, CPC team began by grouping PDO’s Water Shut-Off challenges into 8 problem statements and presented it to known global providers. A workshop was organized inviting all contractors to propose solutions to the stated problems and acquaint PDO with available solutions. Based on our findings and confirmatory laboratory tests, the CPC team developed a Heatmap, which is a solution matrix that matches problems with solutions. A multidisciplinary assessment team was also created responsible for reviewing every project and proposing realistic solutions. Since then more than 33 well trials – mainly in carbonate formations – have been completed at over 52% success rate using 3 existing contractors. Encouraged by these results, the company awarded umbrella contract to 3 other contractors to deploy a wider range of systems expected to boost success rate. The company strongly believes that increased success rate can be achieved by exploiting wider choice of effective systems, as inspired by laboratory trials. This paper, therefore, presents the strategy, team, methodology, and overall results of the trials to date.
机译:阿曼石油开发(PDO)生产中超过85%的水是无水的,到2012年可能会增加到95%。2004年,化学概况控制(CPC)团队成立,以协调化学水的2年试验部署全公司关闭技术。目的是在确保目标采收率的同时减少不想要的水或气体进入,以提高油气产量。化学系统的部署受到以下四个主要挑战的不利影响: (1)专有技术有限,尤其是石油工程师和油井工程师;(2)缺乏候选人和化学品选择的多学科方法;(3)部署前的概念证明;(4)成功的定义和衡量。为解决此问题,CPC团队首先将PDO的“水禁”挑战分类为8个问题陈述,然后将其提交给全球知名提供商。举办了一个研讨会,邀请所有承包商提出解决上述问题的方法,并使PDO熟悉可用的解决方案。根据我们的发现和经过验证的实验室测试,CPC团队制定了热图,这是一个将问题与解决方案相匹配的解决方案矩阵。还成立了一个多学科评估小组,负责审查每个项目并提出切实可行的解决方案。自那时以来,已经有3位现有承包商完成了33多次试井(主要在碳酸盐岩地层中)的成功率超过52%。受这些结果的鼓舞,该公司向其他3个承包商授予了总括性合同,以部署更广泛的系统,有望提高成功率。该公司坚信,在实验室试验的启发下,通过开发更多有效系统,可以提高成功率。因此,本文介绍了迄今为止的试验策略,团队,方法和总体结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号