首页> 外文会议>European Formation Damage Conference >Strategic Deployment of Chemical Systems in Petroleum Development Oman
【24h】

Strategic Deployment of Chemical Systems in Petroleum Development Oman

机译:石油开发化学品系的战略部署阿曼

获取原文

摘要

Over 85% of Petroleum Development Oman (PDO) production is water and without action, this may increase to 95% by 2012. In 2004, a Chemical Profile Control (CPC) team was launched to coordinate a 2-year trial deployment of chemical water-shut-off technologies across the company. The aim being to reduce unwanted water or gas ingress for the purpose of improving oil or gas production while securing target recovery. The deployment of chemical systems is adversely affected by four major challenges, namely; (1) limited know-how, especially of petroleum engineers & well engineers, (2) lack of multidisciplinary approach to candidate & chemical selection, (3) proof of concept before deployment and, (4) definition & measurement of success. To tackle this problem, CPC team began by grouping PDO’s Water Shut-Off challenges into 8 problem statements and presented it to known global providers. A workshop was organized inviting all contractors to propose solutions to the stated problems and acquaint PDO with available solutions. Based on our findings and confirmatory laboratory tests, the CPC team developed a Heatmap, which is a solution matrix that matches problems with solutions. A multidisciplinary assessment team was also created responsible for reviewing every project and proposing realistic solutions. Since then more than 33 well trials – mainly in carbonate formations – have been completed at over 52% success rate using 3 existing contractors. Encouraged by these results, the company awarded umbrella contract to 3 other contractors to deploy a wider range of systems expected to boost success rate. The company strongly believes that increased success rate can be achieved by exploiting wider choice of effective systems, as inspired by laboratory trials. This paper, therefore, presents the strategy, team, methodology, and overall results of the trials to date.
机译:超过85%的石油开发阿曼(PDO)生产是水,没有行动,到2012年可能会增加到95%。2004年,推出了化学型材控制(CPC)团队,以协调化学水的2年试验部署-Shut-Off Technologies遍布公司。目的是减少不需要的水或气体进入,以改善石油或天然气生产,同时确保目标恢复。化学品系的部署受到四个主要挑战的不利影响,即; (1)有限的专业知识,特别是石油工程师和工程师,(2)缺乏多学科方法来候选人和化学选择,(3)部署前的概念证明,(4)成功的定义和测量。为了解决这个问题,CPC团队通过将PDO的水关闭挑战分组成8个问题陈述,并向已知的全球提供者提出。组织讲师邀请所有承包商提出解决方案的解决方案,并获得可用解决方案的熟悉的PDO。基于我们的调查结果和确认实验室测试,中共队的队伍开发了一种热爱图,即匹配解决方案的解决方案矩阵。多学科评估团队还造成负责审查每个项目并提出现实解决方案。从那时起,超过33种良好的试验 - 主要是碳酸盐块组织 - 使用3个现有承包商完成了超过52%的成功率。通过这些结果鼓励,该公司向其他3个承包商授予伞合同,以部署更广泛的系统,预计将提高成功率。本公司强烈认为,通过利用更广泛的有效系统,可以通过实验室试验的启发来实现增加的成功率。因此,本文介绍了迄今为止审判的策略,团队,方法和整体结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号