首页> 外文会议>North American tunneling 2014 proceedings >Urban EPB Tunneling in Limited Space: A Case Study of the San Francisco Central Subway Project
【24h】

Urban EPB Tunneling in Limited Space: A Case Study of the San Francisco Central Subway Project

机译:有限空间中的城市EPB隧道:以旧金山中央地铁项目为例

获取原文
获取原文并翻译 | 示例

摘要

The San Francisco Central Subway project is a challenging modern example of urban tunnelingrnin limited space conditions. Two 6.3 m diameter Earth Pressure Balance Machines (EPBs) are excavatingrnparallel 2.5 km long tunnels under low cover and in mixed ground conditions. The small launch site situatedrnbetween an interstate and an off-ramp, highly curved tunnel alignment, and geology are particular challenges.rnThese elements required customized tunnel and machine design, from TBM shipment and assembly, to launchrnand excavation.rnThis paper discusses the project challenges and solutions at the Central Subway project, with a focusrnon TBM and continuous conveyor logistics. Requirements of the project include explosion-proof electricalrncomponents, laser-guided survey, rubber-tired supply vehicles, and machine and back-up solutions for steeprninclines and tight curves.
机译:旧金山中央地铁项目是在有限的空间条件下进行城市隧道运输的具有挑战性的现代范例。两台直径6.3 m的土压平衡机(EPB)在低覆盖度和混合地面条件下开挖了平行的2.5 km长的隧道。州际公路与匝道之间的小型发射场,高度弯曲的隧道路线和地质条件是特殊的挑战。这些要素需要定制的隧道和机器设计,从TBM的运输和组装到发射和挖掘。rn本文讨论了项目挑战和聚焦地铁TBM和连续输送机物流为中央地铁项目提供解决方案。该项目的要求包括防爆电气部件,激光制导测量,橡胶轮胎供应车辆以及用于陡坡和紧弯的机器和后备解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号