首页> 外文会议>Rapid Excavation and Tunneling Conference >Preparation for Tunneling, Don River Central Waterfront Coxweli Sanitary Bypass Tunnel Project in Toronto, ON
【24h】

Preparation for Tunneling, Don River Central Waterfront Coxweli Sanitary Bypass Tunnel Project in Toronto, ON

机译:隧道隧道的准备工作在多伦多卫生卫生卫生隧道项目

获取原文

摘要

The Don River & Central Waterfront Coxweli Sanitary Bypass Tunnel Project in Toronto will extend approximately 10.5 km from Ashbridges Bay Treatment Plant west under Lake Shore Boulevard, north under Bayview Avenue and east through the Don River park area to the Coxweli Ravine Park. The tunnel will be mined by using a shielded tunnel boring machine capable of operating in EPB mode and lined by using a precast concrete segmental tunnel linear with an internal diameter of 6,300 mm and external diameter of 6,900 mm. In addition to the TBM excavated tunnel, the scope of this project includes two sections of tunnel using hand tunnel construction methods, five shafts corresponding to the locations of 5 sewer structures, eleven drop shafts, vent shafts, deaeration and adit tunnels to be designed and constructed, two diversion structures and two consolidation sewers to be constructed using mainly open cut and shored excavation methods, 8507 Connection from the existing wet weather flow outfall to one of the shafts and North Toronto Sanitary Trunk Sewer from the existing sewer to one of the shafts. This paper summarizes the preparation work that has been done prior to the launch of the TBM.
机译:顿河及中央滨水Coxweli卫生绕道隧道工程在多伦多将从Ashbridges湾处理厂以西约延长10.5公里在湖滨大道,北下湾景大道和东部通过顿河园区的Coxweli溪谷公园。该隧道通过使用能够在EPB模式下操作,并通过使用预制混凝土节段性隧道线性与6300毫米的内径和6900毫米外径衬里屏蔽的隧道掘进机开采。除了TBM挖掘隧道,该项目的范围包括对应于5层下水道结构,11个轴的位置使用手隧道施工方法隧道的两个部分,五轴,通风口被设计轴,脱气和硐隧道和构造,使用主要是明挖和支撑力的挖掘方法构建了两个导流建筑物和两个整合下水道,从现有的潮湿天气8507连接流口从现有的下水道轴和北多伦多卫生干渠之一,其中一个轴。本文总结了已推出的TBM之前所做的准备工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号