Parallel machines with rescheduling, fixed due date, machine breakdown to reduce makespan and tardiness

机译:平行机与重新安排,固定截止日期,机器故障减少薄洁和迟到

获取原文

摘要

We consider a parallel machine with rescheduling, fixed due date, machine breakdown to reduce the makespan and tardiness. If any of the jobs affected, due to the machine breakdown it will be rescheduled. Reschedule is measured by the total tardiness is based on the original makespan due date. In industry, the scheduling with fixed due dates are commonly used. In this article, a mixed integer program is formulated. The problem has been solved effectively using the Hybrid Genetic Algorithm. The performance measure has been analyzed for comparing the various types of the algorithms.
机译:我们考虑并行机器,具有重新安排,固定的截止日期,机器崩溃,以减少Makespan和迟到。 如果受影响的任何作业,由于机器故障,它将被重新安排。 重新安排通过总迟到基于原始Makespans截止日期来衡量。 在工业中,通常使用固定期日期的调度。 在本文中,配制了混合整数程序。 使用混合遗传算法有效地解决了问题。 已经分析了绩效措施以比较各种类型的算法。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号