REVEGETATION OF DISTURBED AREAS ON TROPICAL FOREST: A CASE STUDY ON A GAS FIELD, SEISMIC PROGRAM ABANDONMENT AND PIPELINE RIGHT-OF-WAY (ROW) CLOSURE

机译:热带森林中受扰动区域的恢复 - 一种案例研究气田,地震节目遗弃与管道权(行)关闭

获取原文

摘要

This document describes the revegetation techniques and works carried out to control erosion and sediment problems along a pipeline ROW and helipads (HPs) used during a seismic prospecting and gas transport programs. HPs consist of 40×40 m cleared squares, with bare soil at the center for landing and vegetal debris piled at the perimeter. These works were part of a gas field development project in the south eastern jungle of Peru. They comprised the construction of four platforms (2 ha each), approximately 68 km of flowlines (from drilling platforms to gas plant) and a logistic base (123 ha including landing strip, gas plant and quarries). The seismic program started during the rainy season (February 2002), with a 3D block of 4150 km of seismic lines (764 km2) and 73 HPs, covering 18 ha, cleared for logistics support. The closure plan for the 73 HPs and fly camps (FCs) was prepared to include revegetation started during the dry season (August 2002). About 26500 tree seedlings were used in all, of which 23000 were natural grown seedlings gathered from surrounding forest and 3500 were produced in two small nurseries. Nurseries propagated 10 fast growing woody species. Natural grown seedlings covered 65 representative species, all familiar to local natives by their use and appearance. ROW clearing of the first 28 km of flowlines started in March 2002, after the rainy season. Stabilization began in July, mainly reconfiguring manually drainage network and slopes. Once pipelines were buried, erosion control measures (sediment traps, check dams and slope breakers) were installed. The revegetation plan included techniques, plantation layout designs and resources needed to complete the job. The work covered 28 km sections of ROW and 4 km of access roads (approximately 58 ha), combining tree planting, broadcast grass seeding and stolons transplanting, totaling 21500 tree seedlings. Over pipes, seeds and grass stolons were sown to reduce runoff quickly. On other areas, trees were planted in order to complement the stabilization of disturbed areas, to produce shadow and thus enhance the recovery of surrounding forest species.
机译:本文档描述了在地震勘探和天然气运输计划期间使用的管道行和Helipads(HPS)控制侵蚀和沉积物问题的恢复技术和作品。 HPS由40×40米的清除方块组成,带有裸露的土壤,用于在周边堆积的着陆中心和植物碎片。这些作品是秘鲁南部丛林中煤田开发项目的一部分。它们包括建设四个平台(每一个HA),大约68公里的流线(从钻井平台到煤气厂)和物流基地(123公顷,包括着陆带,煤气厂和采石场)。地震计划在雨季(2002年2月)开始,3D块距离4150千米的地震线(764 km2)和73千桶,占地18公顷,清理物流支持。准备73个HPS和飞行营地(FCS)的关闭计划,包括在干燥季节(2002年8月)期间开始的植被植被。所有约26500年幼苗用于所有,其中23000个是从周围森林收集的自然种植幼苗,两种小苗圃中产生3500种。托儿所宣传了10个快速种植的木质物种。自然种植的幼苗覆盖了65种代表性物种,通过它们的使用和外观熟悉局部当地人。在雨季后,2002年3月开始的前28公里处的第一个28公里处的排放。稳定开始于7月开始,主要重新配置手动排水网络和斜坡。一旦埋入管道,安装了侵蚀控制措施(沉积物陷阱,检查坝和斜坡断路器)。植入计划包括完成工作所需的技术,种植园布局设计和资源。这项工作涵盖了28公里的行和4公里的通道道路(约58公顷),结合树种植,广播草播种和匍匐茎移植,共21500年幼苗。在管道上,种子和草匍匐茎被播种以迅速减少径流。在其他领域,种植树木以补充受干扰区域的稳定,产生阴影,从而增强周围森林物种的恢复。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号