Pipe Land Transportation Through South America Andes/Cordillera:Company Bolivie,Incahuasi Project Phase 1

机译:管道土地运输通过南美洲和科特里拉:玻利维利公司,Incahuasi项目阶段1

获取原文

摘要

The Company project,located in Bolivia,was implemented in 2014.The project is a green field development of three wells connected to a Central Processing Facility,including export pipelines and flowlines(gas & condensate).During the construction phase,the Project hadto transfer 8883 pipes for gas export lines and flow lines that represented a total weight of more than 30000 Tons from Chile to Bolivia.The World Health Organisation's Global Status Report on Road Safety(2013)explained that Bolivia hada road traffic death rate of 19 per 100 000 population(France= 6).The hazard due to Road transportationwas identified at early stage of the project sanction and was classified as Major Operational Risk.Thechallenge was to ensure a high safety level along the 1478 km transportation route.The Cordillera Occidentalgeographical context and environmental conditions create one of the most dangerous roads in the world.The objective defined by the Project Management Team was to achieve zero accidents in pipe transport.Project team reinforced contractual HSE aspects with strong requirements and expectations in transportationmanagement(Not only for the Contractor but also for their subcontractors and suppliers).A Road Safetyspecialist was contracted to join the Project HSE Team in order to prepare,assist and monitor the landtransportation of pipes by road jointly with the Contractor.Key documents prepared and approved with the contractors were the HSE Plan and Transportation &Lifting Plan.Within these documents,specific elements of focus included(but not limited to): 1.Journey Management.2.Transportation and offloading pipe Analysis.3.Road Traffic study.4.Route Risk Analysis.5.Control/Checking points before critical routes.6.Vehicles inspection and approval by 3rd Party.7.Monitoring and tracking of vehicles IVMS(In Vehicle Monitoring System).8.3rd party training of all drivers(244).The INCAHUASI Project successfully reached the HSE target for LLI pipes supply: Zero accidents during 67 weekly trips covering a distance of 4 million kilometers over the 5-monthcampaign.This is due to rigorous compliance and good co-operation of the workforce,Leadership &Commitment of Management from the Company and above all,its Partners.
机译:位于玻利维亚的公司项目于2014年实施。该项目是一个与中央加工设施相连的三个井的绿地开发,包括出口管道和流动线(气体和冷凝水)。施工阶段,项目达到施工阶段8883型气体出口线和流量线,从智利到玻利维亚的总重量超过30000吨。世界卫生组织关于道路安全的全球地位报告(2013年)解释说,玻利维亚Hada道路交通死亡率为每100 000人口(法国= 6)。项目制裁早期阶段鉴定的道路运输危险,被归类为主要的运营风险。这项是沿1478公里的运输路线确保了高安全水平。Cordillera Occidentalgeographical背景和环境条件创造了世界上最危险的道路之一。项目管理团队所定义的目标是实现零意外在管道运输中。产品加强了具有强大要求和运输管理人员的合约HSE方面的合同HSE方面(不仅适用于承包商,也适用于其分包商和供应商).A Road Safetyspecialist签约加入项目HSE团队,以便准备,协助和通过与承包商联合监控管道的土地革命​​。与承包商编制和批准的警告是HSE计划和运输和提升计划。在这些文件中,包括(但不限于)的特定重点要素:1.Journey Management。 2.输出和卸载管道分析.3。进程流量研究.4.Route风险分析.5.control /检查点在关键路线前.6.VENLINELE通过第3派对的检查和批准.7。IVMS的监测和跟踪IVMS(IN车辆监测系统).8.3所有司机的党校培训(244)。Incahuasi项目成功达到了LLI管道供应的HSE目标:零意外6 7每周旅行覆盖5个月CAMPAIGN的400万公里。这是由于员工的严谨合规性和良好的合作,公司的领导和管理层的良好合作,最重要的是,其合作伙伴。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号