首页> 外文会议>International Conference on Design, Simulation, Manufacturing: The Innovation Exchange >Production Planning and Setup Time Optimization: An Industrial Case Study
【24h】

Production Planning and Setup Time Optimization: An Industrial Case Study

机译:生产规划和设置时间优化:工业案例研究

获取原文

摘要

Production activity control approaches, methods, and mechanisms have been widely applied over the last decades, and continue to be of utmost importance nowadays, within the context of the currently fast-growing Industry 4.0 era. In this paper, a Simio-based simulation model is proposed and its application in a printing factory is illustrated. The main aim of this work consists of providing general production planning improvements in the considered factory, with a special focus on the reduction of setup time. The proposed model is based on several distinct production activity control mechanisms, for instance, the CONWIP and the Routing Group mechanisms from Simio, which did enable to reach good improvements regarding a set of performance measures considered, including machines' setup time reduction, along with the maximization of the percentage of products delivered on time. Future work is also planned to be carried out to improve other kinds of performance measures, and by using other types of production activity control mechanisms, to be further applied in other industrial companies and sectors.
机译:在过去的几十年中,生产活动控制方法,方法和机制在目前快速增长的行业4.0时代的背景下,现在日趋广泛地应用。本文提出了一种基于SIMIO的仿真模型,并说明了其在印刷厂的应用。这项工作的主要目的包括在考虑的工厂提供一般生产计划改进,特别关注设置时间的减少。该建议的模型基于多种不同的生产活动控制机制,例如,SIMIO的CONWIP和路由组机制,这确实能够达到关于考虑的一系列性能措施的良好改进,包括机器的设置时间减少按时交付的产品百分比的最大化。未来的工作还计划进行以提高其他类型的性能措施,并通过使用其他类型的生产活动控制机制,进一步适用于其他工业公司和部门。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号