首页> 外文会议>XXV International Conference on Information, Communication and Automation Technologies >Partial discharges measurements as an on-site diagnostic tool during after-laying tests of high voltage extruded cable systems
【24h】

Partial discharges measurements as an on-site diagnostic tool during after-laying tests of high voltage extruded cable systems

机译:在铺设高压挤压电缆系统的铺设测试期间,部分将测量值作为现场诊断工具。

获取原文

摘要

In order to determine actual condition of the cable systems and to determine their future performances, it is necessary to include the procedures for partial discharges (PD) measurements in addition to after-laying testing of new-installed high voltage (HV) power extruded cables. In this work primarily the need to test HV extruded cable systems on PD during after-laying test is considered. By simulation of two types of defects with contemporary software support COMSOL Mph inside the cable accessories, resulting as bad workmanship during installation and/or transport and storage, attempt is to justify the needs for PD measurements inclusion in actual standards concerning analyses of extruded cable systems (IEC 60840 and 62067).
机译:为了确定电缆系统的实际条件并确定其未来的性能,除了新安装的高压(HV)功率挤压电缆的铺设后的铺设后,还需要包括部分放电(PD)测量的程序。在这项工作中,考虑了在铺设后测试期间测试HV挤出电缆系统的需要。通过模拟与当代软件的两种类型的缺陷支持电缆配件内的COMSOL MPH,导致安装和/或运输和存储过程中的工作不良,尝试是为了在挤出电缆系统分析的实际标准中涵盖PD测量的需求。 (IEC 60840和62067)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号