首页> 外文会议>Complex Orebodies Conference >Case study - Ernest Henry Mine: designing step out zones in an inclined sub-level cave
【24h】

Case study - Ernest Henry Mine: designing step out zones in an inclined sub-level cave

机译:案例研究 - 欧内斯特亨利矿:在倾斜的次级洞穴中设计Step Out区域

获取原文

摘要

Ernest Henry mine (EHM) is a sub-level caving operation located in north-west Queensland, Australia. Located below a previously mined open pit, the underground operation ramped up production to 6.8Mt/a in 2017. The EHM ore body dips at 45 degrees to the South and therefore requires each level to “step out” from the level above as seen in FIG 1. Within this step out zone it is important to both maximise recovery and allow for efficient operation of the underground workings production to bring the level up to full production as quickly as possible. Throughout the step out design process, a combination of further defining the ore boundary, using lessons learnt from production performance on upper levels and the introduction of design improvements, has reduced the production ramp-up time, decreased costs and increased recovery for a single level at EHM.
机译:Ernest Henry Mine(EHM)是位于澳大利亚昆士兰西北部的子级洞穴操作。地下运行位于先前开采的露天坑下方,2017年升高到6.8mt /张/ A. EHM矿体在45度到南部,因此要求每个级别从上面的水平“走出”图1.在该步骤中,区域内的恢复最大化并允许允许地下工作的高效运行,以使水平尽快达到全部生产。在整个步进设计过程中,进一步定义矿石边界的组合,使用从生产性能上的上层课程获得的经验教训以及设计改进的引入,降低了生产率增加的时间,降低了成本并增加了单个级别的恢复增加在EHM。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号