首页> 外文会议>Modern Electric Power Systems (Conference) >Efficiency and Cost Evaluation of Distribution Systems based on Multiple Time Points
【24h】

Efficiency and Cost Evaluation of Distribution Systems based on Multiple Time Points

机译:基于多个时间点的分配系统效率和成本评估

获取原文

摘要

Phase balancing can offer planning engineers a low-cost means of reducing operating costs, improving efficiency in electric power systems. In general, utilities make phase balancing based on peak load by thinking that is the worst case scenario, but every time is not the case. In this paper, time varying phase balancing algorithm is proposed to investigate the effect of hourly phase balancing for all year (8760 hour for a year) and also evaluate system efficiency and cost saving for all hours. Additionally, it is important for the planning engineers to estimate losses accurately to make phase moves, and the peak load does not always provide the most efficient phase moves among the hours in year. In this paper, there different scenarios will be compared; base case, phase balancing based on peak load, and hourly time varying phase balancing. These scenarios will be compared based on loss reduction, and cost saving with Locational Marginal Price (LMP) to provide the planning engineers ideas about effective power system planning.
机译:相位平衡可以提供规划工程师降低运营成本的低成本手段,提高了电力系统的效率。通常,实用程序通过思考是最糟糕的案例场景,基于峰值负荷进行相位平衡,但每次都不是这种情况。在本文中,提出了时间变化阶段平衡算法来研究全年每年相位平衡的影响(每年8760小时),并为所有时间评估系统效率和节省成本。此外,规划工程师很重要,以便准确地估计损失以使相位移动,并且峰值负荷并不总是提供最有效的相位在年份之间移动。在本文中,将有不同的场景;基本情况,基于峰值负荷的相位平衡,以及每小时时变相平衡。这些情景将基于减少损失减少,并以现场边际价格(LMP)节省成本节约,为规划工程师提供有关有效电力系统规划的思考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号