首页> 外文会议>International Conference on Chemical, Material and Food Engineering >Technology Research on Traffic Organization of Wuhan Municipal Engineering Projects Under Construction
【24h】

Technology Research on Traffic Organization of Wuhan Municipal Engineering Projects Under Construction

机译:建设中武汉市工程项目交通组织技术研究

获取原文

摘要

Present Chinese big cities are facing one common problem that road resources have being occupied by the construction of traffic projects. In order to solve the problems of traffic organization during construction properly, this paper put forward the research content and technical principle of municipal engineering projects traffic organization firstly, then suggest a method of traffic organization for viaduct according to the characteristics of the construction period that is divided into three stages (pipelines reconstruction renovation, substructure construction and superstructure construction), which was applied to Traffic organization scheme for construction period of Wuhan Road in Hankou, and it has achieved desired effect. Refer to traffic organization of Wuhan municipal projects under construction, other types of construction projects can be elevated to organize traffic reasonably and keep city traffic common operation, with the consideration of the project characteristics and the actual situation of traffic during construction.
机译:当今中国大城市面临着交通项目建设所占据的道路资源的一个共同问题。为了解决施工过程中交通组织的问题,本文首先提出了市政工程项目流量组织的研究内容和技术原则,然后根据建设时期的特点建议一种高架桥交通组织的方法分为三个阶段(管道重建装修,亚结构建设和上层建筑建设),应用于汉口武汉路施工期间的交通组织方案,实现了所需效果。参考武汉市项目的交通组织正在建设中,其他类型的建筑项目可以提升合理组织交通,并考虑项目特征和建设期间交通的实际情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号