Research on Scheduling of Jobs with Bottleneck of Stretch in Plane Manufacturing

机译:平面制造中伸展瓶颈安排工作的研究

获取原文

摘要

This paper proposed a heuristic algorithm based on due-dates for a stretch machine scheduling problem in the plane manufacturing industry. Factory-specified due-dates for jobs, oven capacity, stretch machine availability, and setting times were incorporated into an Integer-Programming model. To uarantee the due-dates of different orders, maximizing the efficiency of bottleneck resource (i.e., stretch machine in this paper) must be considered. Then, the problem was translated into an analysis on minimizing the make-span of all jobs on stretch machine by scheduling. Because of the computational complexity of the problem, we developed a heuristic approach. Computational experience indicates that the heuristic gives high quality solutions with significant savings in time over standard IP algorithms.
机译:本文提出了一种基于飞机制造业中拉伸机调度问题的基于延迟的启发式算法。工厂指定的作业,烤箱容量,拉伸机可用性和设置时间的日期被纳入整数编程模型。对于UARANTEE,必须考虑不同订单的日期,最大化瓶颈资源的效率(即,本文中的拉伸机)。然后,该问题被翻译成了通过调度最小化拉伸机上所有作业的制作跨度的分析。由于问题的计算复杂性,我们开发了一种启发式方法。计算经验表明启发式提供高质量的解决方案,并在标准IP算法上迅速节省了高质量的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号