首页> 外文会议>International^Erosion^Control^Association Annual Conference and Expo >Sediment Barrier Performance Evaluations Using a Full-ScaleTesting Apparatus
【24h】

Sediment Barrier Performance Evaluations Using a Full-ScaleTesting Apparatus

机译:使用全刻度装置的沉积物屏障性能评价

获取原文

摘要

J. Blake Whitman: Mr. Blake Whitman is a Graduate Research Assistant pursuing a Ph.D. in the Department of Civil Engineering at Auburn University. He specializes in construction site logistics planning, construction site erosion and sediment control practices, heavy civil project management, and MS4 analysis. He has worked as a project manager within the private construction industry, as well as with the U.S. Army Corps of Engineers. Currently his research efforts focus on improving sediment barrierstandard practices for the Alabama Department of Transportation.
机译:J. Blake Whitman:布莱克惠特曼先生是追求博士学位的研究生研究助理。在Auburn大学土木工程系。他专注于施工现场物流规划,施工现场侵蚀和沉积物控制实践,重型民用项目管理和MS4分析。他曾担任私建建筑行业的项目经理,以及美国军队的工程师。目前他的研究努力专注于改善阿拉巴马州运输部的沉积物障碍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号