This project consisted of a 54-inch steel siphon pipe which is used to convey Colorado River water for the Orchard Mesa Irrigation District near Palisade, CO. Prior to any repair, this section of pipe was leaking like a sieve and the delaminating liner was impeding the flow through the siphon. Due to the steep slopes and limited staging at each access point around the siphon, trenchless technology was the best and most economical repair solution.The repair started by removing two partially delaminated coatings and sandblasting to a near white metal finish. The 0.25-inch thick steel pipe was severely corroded, and the repaired stretch of pipe had numerous leaks that were sealed with a combination of urethane injection, hydrophilic grout, and welded steel patches. Once all existing coatings were removed and leaks were sealed a single layer of Glass Fiber Reinforced Polymer (GFRP) was installed to further seal the leaks and act as a dielectric barrier for areas in which Carbon Fiber Reinforced Polymer (CFRP) was to be installed. Within the 315-foot total repair region, 156-feet of pipe had been damaged by the impact of a landslide, inducing a slight ovality within the pipe. The damaged area was strengthened by installing a single layer of CFRP which provided the equivalent capacity of 3/16-inch Grade 36 steel.The winter weather provided for a challenging project, but two weeks after this project was complete, the siphon was back in service delivering water to numerous orchards in the surrounding area.
机译:该项目由54英寸钢虹吸管组成,用于在普拉索德附近的乌萨马州灌溉区传达科罗拉多河水。在任何修复之前,这段管道就像筛子一样泄漏,分层衬垫妨碍了分层衬垫流过虹吸管。由于虹吸管周围的每个接入点的陡坡和有限的阶段,挖沟技术是最好,最经济的修复解决方案。通过除去两个部分分层的涂层和喷砂至近白色金属表面的喷砂开始。 0.25英寸厚的钢管严重腐蚀,修复的管子的管道具有许多泄漏,其用氨基甲酸酯注射,亲水灌浆和焊接钢贴片的组合密封。一旦除去所有现有涂层并密封泄漏,安装了一层玻璃纤维增​​强聚合物(GFRP)以进一步密封泄漏并充当待安装碳纤维增强聚合物(CFRP)的区域的介电屏障。在315英尺的总修复区内,156英尺的管道损坏了滑坡的影响,诱导管道内的轻微植物。通过安装单层CFRP来加强受损区域,该CFRP提供3/16英寸36级钢的等效能力。冬季天气为一个具有挑战性的项目提供,但这个项目完成后两周后,虹吸回来的服务将水交给周边地区的众多果园。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号