Integrating House of Risk Method with PESTLE and CIMOSA for Risk Assessment of Java-Bali I Pow er Plant Construction Project

机译:杂技所与杂志和CIMOSA集成杂志和CIMOSA对Java-Bali i Pow Er植物建设项目的风险评估

获取原文

摘要

Java-Bali I Combined Cycle Power Plant Project is part of 35,000 MW electrical generating development program. To fulfil the project construction objectives, a risk assessment is needed. It is started with risk identification using PESTLE analysis and CIMOSA approach. It can be identified that there are 18 risk events for external factor, 22 risk events for internal factor and 54 risk agents that will be analysed using House of Risk (HOR) stage 1 method. Focus Group Discussion (FGD) is held for assessing severity of each risk events and occurrence of risk agents, also the correlation between them. Using HOR stage 1 is obtained Aggregate Risk Potential (ARP) value for each risk agents. Using pareto analysis, 11 risk agents is chosen as priority and will be evaluated using HOR stage 2. Using HOR stage 2 method, 7 preventive actions (PA) are identified to prevent risk agents occur. As final result, using Cost Benefit Analysis (CBA), 7 recommendations is suggested in order to make project successful according to the target specified.
机译:Java-Bali I组合循环电厂项目是35,000 MW发电开发计划的一部分。为了满足项目建设目标,需要风险评估。利用杵分析和Cimosa方法开始识别风险识别。可以识别出存在的外部因素有18个风险事件,内部因素的22例和54个风险特征,将使用风险阶段(Hor)第1阶段方法进行分析。焦点小组讨论(FGD)被认为是评估每个风险事件的严重程度和风险代理的发生,也是它们之间的相关性。使用HOR阶段1获得每个风险代理的总风险潜力(ARP)值。使用Pareto分析,选择11种风险剂作为优先权,并使用Hor Stage 2进行评估。使用Hor Stage 2方法,确定了7种预防措施(PA)以防止风险特性发生。作为最终结果,使用成本效益分析(CBA),建议提供7项建议,以便根据规定的目标进行项目成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号