Delay Study is to evaluate the quality of traffic movement along a route and to determine the level of service at a study area. This study can be used to compare and evaluate operational conditions before and after roadway or when intersection improvements have been made. The objective of this study is to compare before and after the improvement of intersection into roundabout in term of delay time and level of service. This study only focused at the intersection which had massive congestion along Pengkalan Weld road. There are two intersections which experience a massive traffic jam during morning peak hour. The worst traffic jam occurs at the intersection connected to Gat Jalan Magazine (Case study area 1) especially for the vehicle coming from south of Pengkalan Weld to north bound. This traffic jam occurs because of the long cycle of traffic signal. The second worst traffic jam occours at the intersection connected to Gat Lebuh Chulia (Case study area 2). It is a 4 leg-intersections without a traffic signal. The traffic jam occur at the particular section because there is no traffic light which could guide the road users to cross that conflict area. The minor road which is from Gat Lebuh Chulia has disrupted the major road which is the Pengkalan Weld road. Thus, the motivation of current research is to evaluate these intersections into the space sharing intersection or also known as roundabout. To achieve this purpose, the simulation VISSIM model had been created.VISSIM software was also used to analyse the field data by using the average speed method. The field data was collected during AM peak hour since it has the highest traffic volume per hour compare to PM peak and off peak. From the result both method (vissim and field data) produced slightly the same result in delay time. This means that VISSIM simulation is acceptable to be used. Second model was develop in order to design roundabout by using the VISSIM simulation. As conclusion, by using Vissim simulation it was found that the improvement from intersection to roundabout had minimized delay time and improvement of LOS by 97.8% for Case study area 1 and 75.6% for Case study area 2.
机译:延迟研究是评估沿途的交通运输质量,并确定研究区域的服务水平。本研究可用于比较和评估道路前后的操作条件,或者在交叉路口改进之后。本研究的目的是在延迟时间和服务水平的期限之前和之后比较环形交叉路口。这项研究仅重点关注沿鹏凯兰焊缝道具巨大拥堵的交叉路口。有两个交叉路口在早晨峰值小时内体验大规模的交通堵塞。最糟糕的交通堵塞发生在连接到GAT Jalan杂志(案例研究区域1)的交叉路口中,特别是对于从鹏塔焊的南部到北界的车辆。由于业务信号的长期循环发生,发生这种交通堵塞。第二个最糟糕的交通堵塞在交叉路口连接到GAT Lebuh Chulia(案例研究区2)。它是一个没有交通信号的4个腿交叉点。交通堵塞发生在特定部分,因为没有交通灯可以指导道路用户跨越该冲突区域。来自GAT Lebuh Chulia的小路破坏了彭卡兰焊接路的主要道路。因此,目前研究的动机是评估这些交叉点进入空间共享交叉路口或也称为环形交叉路口。为实现此目的,已经创建了模拟VISSIM模型.Vissim软件还用于通过使用平均速度方法来分析现场数据。在AM高峰时段期间收集现场数据,因为它与PM峰值和关闭峰值相比每小时最高的交通量。从结果,两种方法(Vissim和现场数据)在延迟时间略有相同的结果。这意味着可以使用VISSIM模拟。通过使用VISSIM仿真,开发第二种模型以设计环形交叉路口。总之,通过使用VISSIM模拟,发现与案例研究区域1的案例研究区域1和75.6%的情况下,与环形交叉路口交叉的改善最小化并提高了97.8%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号