Effect of Transmission Switching and Short Circuit on the Transient Stability at Interconnected Power System: A Case Study of 150 kV Mahakam East Kalimantan Electrical Power System

机译:传动式开关和短路对互联电力系统瞬态稳定性的影响 - 以150 kV马哈卡姆东加里曼丹电力系统为例

获取原文

摘要

Mahakam system is an electric transmission line managed by PT. PLN AP2B (State Electricity Company Area of Load Control Center) East Kalimantan. In this research, a test study with transient stability method is given three phases, two-phase and one phase to ground and switching transformer and maneuver line using software Digsilent Power Factory. The frequency and voltage probes are performed by looking at the reference bus graph response and rotor angle observation by looking at the response of the reference generator graph. In a three-phase phase trip, two-phase and one phase to ground frequency oscillation occurs between 0.6% - 0.9%, drop voltage between 0.01 pu to 0.926 pu and a rotor angle change of no more than 120. The case study of switching by manipulating the line from GI Senipah to GI New Balikpapan takes a reasonable oscillation of voltage and frequency for 0.5 seconds. From three case studies of short circuit and one switching, all voltage and frequency oscillations are still below 2% and the rotor angle is not more than 1800 and the time is not more than 10 seconds. However, in the case study of switching transformer 2 the system frequency shift is changed to 12% then a trip occurs on CB2 so that the system can oscillate and start stable at 49.84 Hz frequency according to the standard used as the reference is IEEE Std.c37.1987, SEMI F 42, 47 and ESDM Regulation No. 18 of 2016 on Kalimantan's electricity system.
机译:Mahakam System是由PT管理的电动传输线。 PLN AP2B(州电力公司负载控制中心)East Kalimantan。在本研究中,使用软件Digsilent Power Factory给出了具有瞬态稳定方法的测试研究,两相,两相和一个相对地和开关变压器和机动线。通过观察参考生成器图的响应,通过观察参考总线图响应和转子角度观察来执行频率和电压探针。在三相相跳闸中,两相和一个相对地振荡发生在0.6% - 0.9%之间,下降电压在0.01pp至0.926 pu之间,转子角度变化不超过120.切换的案例研究通过操纵来自Gi Senipah的线到Gi New Balikpapan的合理振荡电压和频率为0.5秒。从短路的三个案例研究和一个切换,所有电压和频率振荡仍低于2%,转子角度不超过1800,时间不超过10秒。然而,在开关变压器2的情况下,系统频移改变为12%,然后在CB2上发生跳闸,使得系统可以根据作为参考的标准的标准以49.84Hz频率振荡并开始稳定。 C37.1987,2016年第2016年第18号SEMI F 42,47和ESDM规则在Kalimantan的电力系统中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号