首页> 外文会议>International Engineering Research and Innovation Symposium >Risk Analysis of Underestimate Cost Offer to The Project Quality in Aceh Province
【24h】

Risk Analysis of Underestimate Cost Offer to The Project Quality in Aceh Province

机译:亚齐省项目质量低估成本报价的风险分析

获取原文

摘要

The possibility of errors in the process of offer price determination could be enormous, so it can affect the possibility of project underestimate cost which can impact and reduce the profit if being implementing. Government Equipment/Service Procurement Policy Institution (LKPP) assesses that the practices of cheaper price in the government equipment/service procurement are still highly found and can be potential to decrease the project quality. This study aimed to analyze the most dominant factors happened in underestimate cost offer practice, to analyze the relationship of underestimate cost offer risk factors to road construction project quality in Aceh Province and to analyze the most potential factors of underestimate cost offer risk affecting road construction project quality in Aceh Province. Road construction projects observed the projects which have been implemented in Aceh Province since 2013-2015. This study conducted by interviewing Government Budget Authority (KPA), and distributing the questionnaire to the road construction contractors with the qualification of K1, K2, K3, M1, M2 and B1. Based on the data from Construction Service Development Institution (LPJK) of Aceh Province on 2016, the populations obtained are 2,717 constructors. By using Slovin Equation, the research samples obtained are 97 contractors. The most dominant factors in underestimate cost offer risk of the road construction projects in Aceh Province is Contingency Cost Factor which the mean is 4.374.
机译:报价确定过程中错误可能是巨大的,因此可能会影响项目低估的成本可能会影响并降低利润,如果实施。政府设备/服务采购政策机构(LKPP)评估了政府设备/服务采购中便宜价格的练习仍然发现,并且可能有可能降低项目质量。本研究旨在分析低估了成本提供实践中的最大主导因素,分析了亚齐省内道路建设项目质量的低估成本提供风险因素的关系,分析了影响道路建设项目的低估成本风险的最潜在因素亚齐省质量。自2013 - 2015年以来,道路建设项目观察了亚齐省实施的项目。本研究通过面试政府预算管理局(KPA)进行,并将调查问卷分配给道路建设承包商,符合K1,K2,K3,M1,M2和B1的资格。基于2016年亚齐省建筑服务开发机构(LPJK)的数据,获得的人口是2,717个构造函数。通过使用Slovin方程,获得的研究样本是97个承包商。低估了亚科省道路建设项目的成本提供风险的最主要因素是意外成本因素,其平均值为4.374。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号