首页> 外文会议>SPE Russian Petroleum Technology Conference >Mobile Wellsite Compressors: New Lease on Life for Mature Gas Field
【24h】

Mobile Wellsite Compressors: New Lease on Life for Mature Gas Field

机译:移动台产石体压缩机:成熟天然气场的新租赁

获取原文

摘要

These days more and more gas and gas condensate fields are reaching the late stage of development, which characterized with an increasing amount of challenges impeding recovery of reserves. In order to solve the problems, oil and gas companies employ different solutions which have certain conditions of practical application and different efficiency. Gas distributed compression solutions based on mobile wellsite compressors can be considered as one of the most modern and efficient solution. This technology has already established an excellent reputation in CIS countries and overseas by demonstrating the high result of implementation. However, in order to decide whether to implement this technology or not, it is required to elaborate a good feasibility study. The low level of the elaboration can easily overestimate the efficiency of the project as well as underestimate it thereby ensuing refusal of potentially efficient project. Since each project of technology implementation is unique it is not enough just utilize a common approach of project implementation to prepare an excellent feasibility study. Currently, it is quite difficult to find a methodology to prepare a decent feasibility study for mobile wellsite compressor implementation. The author while working on mobile wellsite compressor project has obtained solid experience which is reflected in this paper. Based on a dozen of integrated asset modeling simulations system of criteria for candidate selection for wellsite compressor installation was elaborated. In order to improve the efficiency and flexibility of the wellsite compressor operation an optimized approach to well hookup was advised. With the intention of improving the economic efficiency of mobile wellsite implementation set of recommendations was provided. The paper can be used as a basis for creating a solid feasibility study for wellsite compressor implementation. Recommendations provided in the article will enable not only improve the feasibility study but also minimize time and computational power allocated on the project.
机译:这些日子越来越多的气体和气体冷凝物领域正在达到发展的晚期阶段,其特点是越来越大的冒险储备恢复的挑战。为了解决问题,石油和天然气公司采用不同的解决方案,具有一定的实际应用条件和不同的效率。基于移动井架压缩机的气体分布式压缩解决方案可被认为是最现代化和最有效的解决方案之一。通过证明实施的高度结果,这项技术已经在CIS国家和海外建立了卓越的声誉。但是,为了决定是否实施这项技术,需要详细说明良好的可行性研究。低水平的阐述可以容易地高估项目的效率,并低估了它,从而随之而来拒绝潜在的有效项目。由于每个技术实施项目都是独一无二的,只需利用项目实施的共同方法即可制定出色的可行性研究。目前,很难找到一种方法来为移动井岩压缩机实现做出一种体面的可行性研究。作者在移动台球技术压缩机项目上工作已经获得了坚实的体验,这些体验已经反映在本文中。基于十几个集成资产建模模拟,阐述了用于营业压缩机安装的候选选择标准的标准系统。为了提高井架压缩机操作的效率和灵活性,建议了良好连接的优化方法。旨在提高移动井层实施的经济效率,提供了一组建议。该纸可用作为井立管压缩机实现创造坚实可行性研究的基础。本文中提供的建议不仅可以提高可行性研究,还可以实现在项目上分配的时间和计算能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号