首页> 外文会议>SPE/IATMI Asia Pacific Oil Gas Conference and Exhibition >Expanding Innovative Approach of Sand Production Well Remediation - Case Study of First Downhole Ceramic Sand Screens for a Gas Well in Malaysia
【24h】

Expanding Innovative Approach of Sand Production Well Remediation - Case Study of First Downhole Ceramic Sand Screens for a Gas Well in Malaysia

机译:扩大砂生产井的创新方法井里修复 - 马来西亚煤气井井井陶瓷沙屏的案例研究

获取原文

摘要

The current state of oil and gas economics has emphasized focus in managing and optimizing production from mature fields. It is estimated that approximately 70% of the world's oil and gas production are contributed by mature fields. Sand production is common as pressure declines and water breakthrough takes place. Clastic reservoirs with unconsolidated formation sand with moderate and high permeability are prone to produce sand under these conditions. In gas producing environments, conventional sand control can place demands for continued expensive remediation investment through the wells producing life as high gas velocity increases the chances of erosion and failure of downhole equipment. Gas reservoirs have always been an integral part Malaysia's oil and gas business. As the well the portfolio expands to cater for the regional energy demand, focus on fit for purpose sand control in gas wells is crucial in ensuring continuous production delivery to customers. As a current practice, sand production has been handled by standalone metal screens or combined with gravel packing. One of the cheaper options available in the market is the ceramic sand screen that allows for rigless installation while providing durable material which is resistant to erosion caused by high gas velocity for a continuous production as the ceramic material is 10 times harder than steel (Jackson et al., 2015) and it is more resistant to corrosion in comparison to steel (Wheeler et al., 2014). This paper will focus on the revival strategy of a gas well with a currently damaged screen due to erosion. As this is the first through tubing ceramic sand screen deployment in a gas well in Malaysia, a feasibility process was put place to ensure safe operation and deployment success. Depending on the current well completion profiles, the assessment includes selection of sand screen specification, actual installation sequence, methodology in ensuring safe and successful deployment of ceramic sand screen downhole are focused. The study and assessment has provided future reference for superior downhole sand control options in gas well applications.
机译:目前的石油和天然气经济学状态强调,重点是管理和优化成熟领域的生产。据估计,世界上大约70%的石油和天然气生产是由成熟领域的贡献。由于压力下降和水突破发生,砂生产很常见。具有中等和高渗透性的未溶解形成砂的碎屑储层在这些条件下容易产生砂。在天然气生产环境中,传统的砂控制可以通过生产寿命的良好良好的井持续昂贵的修复投资作为高气体速度增加井下设备的可能性。气体储层一直是马来西亚石油和天然气业务的一个组成部分。由于投资组合扩展到迎合区域能源需求,重点关注煤气井中的目的防抱道对确保持续生产给客户至关重要。作为目前的实践,砂生产已由独立金属屏幕处理或与砾石包装联合。市场上可用的更便宜的选项是陶瓷砂屏,允许严格的安装,同时提供耐用的材料,该材料耐腐蚀,由于陶瓷材料比钢更难以达到连续生产的高气体速度而导致的耐腐蚀(杰克逊Et Al。,2015),与钢相比,它更耐腐蚀(Wheeler等,2014)。本文将专注于由于侵蚀由于目前受损的屏幕的气体复兴策略。因为这是马来西亚气体井中的第一个通过管道陶瓷砂屏部署,因此放置了可行性过程,以确保安全运行和部署成功。根据当前的井完成简介,评估包括选择砂屏规范,实际安装顺序,方法,确保井下陶瓷砂屏的安全和成功部署。该研究和评估为燃气井应用中的优质井下防砂选项提供了未来参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号