Electrical Rehabilitation of an Aging Small Hydroelectric Powerhouse Rehabilitation Case Study for presentation at HydroVision 2018, June 26-27 Charlotte, North Carolina

机译:夏洛伐克举办的Adding Small Dirfroelithouth康复案例研究康复案例研究,北卡罗来纳州夏洛特夏洛特

获取原文

摘要

WEC Energy Group owns and operates 30 hydroelectric facilities with a combined capacity of 191 MW. The majority of the facilities were constructed in the early to mid 1900’s. While these facilities have been a dependable source of renewable energy, the facilities are aging and the old electrical gear does not meet current safety or reliability requirements. As a result, WEC Energy Group has implemented a process of evaluating and rehabilitating their hydro fleet. The paper will discuss the specific case study of the Peavy Falls Electrical Rehabilitation Project. The Peavy Falls project is a 12 MW powerhouse with two 6 MW hydroelectric turbines, built in 1943. The paper will highlight objectives used by WEC Energy group in evaluating the facility in preparation for the rehabilitation. The project methodology used will be explained including the facility condition assessment, design basis assumptions, pre-procurement contracting, and construction outage planning. Specific details will be included regarding decisions made for specific equipment upgrades. This included replacement of the line and neutral cubicles, upgrading the facility to digital governors, new protective relays, upgraded station service from 120/208V to 480V, generator rewinds and core re-stacking, excitation replacement with conversion to brushless exciters, and plant controls and communication improvements. Some key challenges faced during the process and modifications made to the original rehabilitation plan will be discussed. Finally, some descriptions and photographs will be used to illustrate how the outage was executed and the facility was rehabilitated.
机译:WEC能源集团拥有并运营30个水电设施,综合容量为191兆瓦。大多数设施都是在1900年初到20年代的建造。虽然这些设施一直是可再生能源的可靠来源,但该设施衰老,旧电气齿轮不符合当前的安全或可靠性要求。因此,WEC能源集团实施了评估和恢复其水力舰队的过程。本文将讨论豆荚瀑布电气康复项目的具体案例研究。 Peavy Falls Project是一家12兆瓦的强电场,1943年建于1943年,建于1943年。本文将突出WEC能量集团在评估康复方面评估设施时使用的目标。将解释使用的项目方法,包括设施条件评估,设计基础假设,预采购预订和建设中断规划。将有关针对特定设备升级所作的决定,将包括具体细节。这包括更换线路和中性隔间,将设施升级到数字调速器,新的保护继电器,从120 / 208V到480V的升级站服务,发电机倒带和核心重新堆叠,激励更换,转换为无刷振动器和植物控制和沟通改进。将讨论对原始康复计划的过程和修改过程中面临的一些关键挑战。最后,将使用一些描述和照片来说明如何执行中断,并且该设施被恢复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号