U.S. Bureau of Reclamation Grand Coulee Third Power Plant: Modernization Gets a Head Start

机译:美国垦务局大瓜埃第三电厂:现代化获得头部

获取原文

摘要

The United States Bureau of Reclamation (Reclamation) is in the process of developing plans and specifications for the modernization of Grand Coulee generating units G19-21. These 690 MW Francis turbine – generator units were the first three units constructed in the Grand Coulee Third Power Plant, and were the worlds’ largest and highest capacity hydroelectric units at the time of their construction. They have been in service for more than 40 years. There have been no major rehabilitations performed on these three generating units since they were installed.
机译:美国的填海局(填海局)正在制定计划和规范的大瓜雷生成单位G19-21的现代化计划和规范。这690兆瓦弗朗西斯汽轮机 - 发电机单元是在大瓜埃尔第三电厂建造的前三个单元,是世界上建设时的最大和最高产能的水电装置。他们一直在服务超过40年。由于安装以来,这三个生成单位没有进行重大康复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号