Idaho Falls Power is a municipal electric utility that owns and operates five hydroelectric plants on the Snake River in Southeast Idaho. The oldest, the Old Lower Plant, was commissioned in 1938 as a WPA Project. It has two Kaplan Turbine driven 1.8 MW generators. In 2011, a fault in the main step-up transformer extended to the stators of the two units causing a catastrophic failure. Given the aged state of the equipment, Idaho Falls Power engaged a consultant to determine the economic feasibility of rebuilding the units, wherein it was determined to be a viable project. In 2014, in cooperation with an engineering consultant, an RFP was developed to secure a general contractor to rebuild the units using owner provided turbines, re-wound stators and rotors, and a new step-up transformer. Hydro Consulting and Maintenance Services Inc. (HCMS) proposal was the one selected and were given notice to proceed in 2015. In late 2016, the project was completed with success, though there with many obstacles to overcome during the year and half of construction.
机译:爱达荷瀑布力量是一家在东南部的蛇河上拥有并在蛇河上拥有和运营五个水力发电厂。最古老的旧工厂,于1938年作为WPA项目委托。它有两个Kaplan涡轮机驱动1.8 MW发电机。 2011年,主要升压变压器中的故障扩展到两个单位的定子导致灾难性失败。鉴于设备老化状态,爱达荷州跌落权力从事顾问来确定重建单位的经济可行性,其中决心是一个可行的项目。 2014年,与工程顾问合作,开发了一个RFP,以确保一般承包商使用所有者提供涡轮机,重新缠绕定子和转子以及新的升压变压器。水电咨询和维护服务公司(HCMS)提案是选为的,并在2015年获得通知。2016年底,该项目成功完成,尽管在年内克服了许多障碍和一半的建设。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号