The Indonesian Regulation which refers to the ICOLD Regulation (International Committee on Large Dam required have the Emergency Action Plan (EAP) guidelines because of the dams have potential failure. In EAP guidelines there is a management of evacuation where the determination of the inundation map based on flood modeling. The purpose of the EAP is to minimize the risk of loss of life and property in downstream which caused by dam failure. This paper will describe about develop flood modeling and inundation map in Krisak dam using numerical methods through dam break analysis (DBA) using hydraulic model Zhong Xing HY-21. The approaches of dam failure simulation are overtopping and piping. Overtopping simulation based on quadrangular, triangular and trapezium fracture. Piping simulation based on cracks of orifice. Using results of DBA, hazard classification of Krisak dam is very high. The nearest village affected dam failure is Singodutan village (distance is 1.45 kilometer from dam) with inundation depth is 1.85 meter. This result can be used by stakeholders such as emergency responders and the community at risk in formulating evacuation procedure.
机译:它指的是国际大坝委员会法规(国际委员会大坝印度尼西亚法规要求必须紧急行动计划(EAP),因为水坝的准则有潜在故障,在EAP准则存在其中基于洪水地图的决心疏散的管理洪水建模。在EAP的目的是尽量减少其造成的溃坝下游的生命和财产损失的风险。本文将介绍有关发展Krisak洪水建模和洪水地图坝使用通过溃坝分析数值方法( DBA)采用液压模型锺腊嗯HY-21。坝失败仿真的方法是基于四边形,三角形和梯形断裂基于孔的裂缝越浪和管道。越浪模拟。管道仿真,利用DBA的结果,Krisak的危险性分类大坝是非常高的。最近的村庄受到影响溃坝是Singodutan村(距离是从大坝1.45公里)w第i个浸水深度为1.85流量计。这个结果可以通过利益相关方使用,如紧急救援人员,并在制定疏散过程风险社会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号