In order to control the deformation of the surrounding rock of the large section of the tunnel, the author analyzes the stratum displacement law caused by the tunnel excavation by means of on-site monitoring. And the optimized design of the existing tunnel pre-reinforcement scheme is carried out. The FLAC3D numerical simulation method is used to verify the feasibility of the pre-reinforcement optimization scheme. Field test showed that the tunnel surrounding rock deformation in the allowable range, and the deformation control measures of the surrounding rock are reasonable and effective. The research results have important guiding significance for future similar project.
机译:为了控制隧道大部分岩石周围岩石的变形,作者通过现场监测分析了由隧道挖掘引起的地层排量法。 并进行现有隧道预加固方案的优化设计。 FLAC3D数值模拟方法用于验证预加强件优化方案的可行性。 现场测试表明,隧道周围岩石变形在允许范围内,周围岩石的变形控制措施是合理且有效的。 研究结果对未来类似项目具有重要的指导意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号