首页> 外文会议>International Conference on Advances in Materials, Mechatronics and Civil Engineering >Numerical analysis of the influence of underpinning pile affected by overlapping tunnel with shield method
【24h】

Numerical analysis of the influence of underpinning pile affected by overlapping tunnel with shield method

机译:用屏蔽法对隧道重叠桩桩影响的数值分析

获取原文

摘要

In order to research the influence of underpinning pile foundation after excavating tunnel with shield construction, the three-dimensional numerical simulation is carried out by using FLAC 3D based on the actual project in Shenzhen. Different finite difference models are established respectively by changing the sequence of overlapping tunnel excavation, the spacing of the overlapped tunnel, the diameter and length of the pile. Then the data of the settlement of the pile foundation are obtained and the results of influences are analyzed.
机译:为了研究挖掘隧道与屏蔽结构挖掘隧道后支撑桩基的影响,通过基于深圳实际项目的FLAC 3D进行三维数值模拟。通过改变重叠隧道挖掘的序列,重叠隧道的间隔,桩的直径和长度来分别建立不同的有限差分模型。然后获得桩基沉降的数据,分析了影响结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号