首页> 外文会议>PAPG/SPE Pakistan Section Annual Technical Conference and Exhibition >Uplifting the Profitability of a Mature Gas Giant in Pakistan Using DiminutiveSidetracks
【24h】

Uplifting the Profitability of a Mature Gas Giant in Pakistan Using DiminutiveSidetracks

机译:使用Diminutivesidetrack振奋在巴基斯坦成熟煤气巨头的盈利能力

获取原文

摘要

One of the key challenges for Oil and Gas industry in current (low price) scenario, is efficient handlingof mature Assets. This is because of the fact that reasonable amount of hydrocarbons still exist in suchreservoirs but in scattered and partially-drained locations. Moreover, lower production rates, combined withever-increasing costs, hardly satisfies the economic screening criteria for their expansion with new wells.This study presents an approach used on such a Mature Gas Giant in Pakistan, in order to re-vitalize oldwells and exploit the scattered sweet spots (still prevailing in reservoir), with the help of a robust engineeringand geological strategy. The field under study was discovered in 1950s, in the eastern onshore area of Pakistan. The primaryreservoir, under study, is a depletion drive fractured limestone i.e. no pressure support was observed in P/Zdata. At present, more than 92% of the EUR has already been produced from this reservoir, which translatesto 82% of Field In-Place volume. However, the performances of multiple wells have gone down with time,due to the depletion in Reservoir Pressure and the channeling of water towards producing wells-throughthe faulted/fractured zone. To cut water production and arrest the Annual field decline of 7-8 %, variousactivities have been carried out, including cementing, tubing size reductions, chemicals; but all the effortswent in vain. In this paper, a detailed approach is presented, that was taken to tap the undrained areas in the vicinity ofthe existing producers - suffering from water hold ups and low gas rate problems. The Production logs wereused first to identify the water production zone. Afterwards, a comprehensive algorithm was developed toanalyze the Geological and Geophysical parameters and identify the undrained prospects while keepingminimal capital exposure. So far, a gain of around 10 MMScfd have been observed with the help of twoengineered Sidetracks - which has added around 10 - 15 BCF reserves in our portfolio. The most common issues encountered in a mature asset are liquid loading and water breakthrough. Thisstudy illustrates the methodology to resolve such issues with minimum investment towards the end of fieldlife. It focuses on the benefits of sidetracks as a production enhancement tool, to reduce the annual decline.This paper offers an innovative approach, to utilize each geological and engineering data set in a systematicmanner, in order to re-work old wells at optimum locations to evade issues affiliated with gas entrapment and water production. In the end, the paper also describes the evaluation process of production gains, geology,well construction, and completion types, that can be adapted to reap maximum rewards in such mature fields.
机译:石油和天然气行业的关键挑战之一(低价)情景,是成熟资产的有效处理。这是因为诸如诸如散射和部分排水的位置的诸如合理的烃仍然存在。此外,较低的生产率,与越来越多的成本结合,几乎不满足于其扩展的经济筛选标准。本研究提出了一种在巴基斯坦这种成熟的天然气巨头的方法,以便重新振兴奥德威尔和利用迅速工程和地质策略的帮助,散落的甜点(储存器中仍然是普遍存在的)。在巴基斯坦东部地区的20世纪50年代发现了该研究。在研究下,小型服务是耗尽驱动破裂石灰石I.E.在P / ZDATA中没有观察到压力载体。目前,超过92%的欧元已从该水库生产,该油库翻译82%的现场容量。然而,由于储层压力的耗尽和水朝向通过断层/裂缝区产生井的窜流,因此多孔的性能随着时间的推移而下降。为了降低水产并逮捕年下降7-8%,辅助活力已经进行,包括胶结,管尺寸减少,化学品;但徒劳的所有努力。在本文中,提出了一种详细的方法,即采取了挖掘现有生产者附近的未经推迟的区域 - 患有水的持有量和低气速问题。生产日志首先才能识别水产生产区。之后,开发了一种全面的算法,以分析地质和地球物理参数,并在留下资金曝光时确定未经审查的前景。到目前为止,借助于双层侧面的帮助,已经观察到大约10 mmscfd的收益 - 在我们的投资组合中增加了大约10-15个BCF储备。成熟资产中遇到的最常见问题是液体装载和水突破。 instudy说明了解决这些问题的方法,这些问题在FieldLife结束时最低的投资。它侧重于侧面作为生产增强工具的好处,以减少年度衰退。本文提供了一种创新的方法,利用SystematicManner中的每个地质和工程数据,以便在最佳位置重新工作旧井逃避与气体夹带和水产的问题。最终,本文还描述了生产收益,地质,井结构和完成类型的评估过程,这可以适应在这种成熟领域中获得最大奖励。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号