In order to further enhance field development in North-West China land, wells were designed to drill 500m short 2-Dimensional curve section with 6~7deg/30m DLS and 2000m length horizontal leg using RSS+LWD BHA. Schlumberger as the contractor, was required to complete curve section in one run through soft shale, and to land in abrasive reservoir sand at over 3000m TVD. Great challenges were mainly on Bit selections, for good balance between steerability and aggressiveness of upper curve section Bit; while achieving minimum 3deg/30m DLS and durability in abrasive sand of horizontal section Bit. Additionally, efficient hole cleaning and BHA stability also play key roles on successful delivery of the wells. After pre-job SQ workshop with operators, hitting target point in curve and maintain BHA's steering capability in horizontal drilling would be the priority concern, to save runs and avoid NPT due to RSS tool steering failure similar to previous operations in offset wells. Working together with contractor Drilling Engineering team, and applying 4D (3-Dimension + Time) FEA Dynamic Analysis System, we were able to offer highly customized and integrated proposal package—including recommended Bit, BHA design and Parameter window, to overcome challenges and optimize drilling efficiency. The 4D FEA Dynamic Analysis System is capable of simulating downhole drill string dynamic behaviors with high accuracy, including Bit/BHA axial & lateral vibrations, stick slip ratio and statistic bending moment/stress distribution along BHA. With unique cutter-rock interaction data from lab test, it offers a large lithology catalog for select specific rock type to be matched with target potential lithology, and also capable of interbedded or sublayer simulation. 4D FEA System has been used to determine Bit selection and parameter window in the pre-job proposal. Our pre-job recommendations were fully taken by operator for field operations. Required DLS has been successfully fulfilled in both curve and horizontal leg, as indicated in FEA analysis. In one well, the record-breaking ROP (>8.6m/hr.) and long footage drilled (500m) had achieved successful well delivery. Also good downhole drill string stability has assisted well TD with over 2000m horizontal section length, achieving longest horizontal legs in whole West China land.
机译:为了进一步提高中国西北地区的现场开发,井设计为使用RSS + LWD BHA使用6〜7deg / 30m DLS和2000m的长度水平腿钻500m短的二维曲线部分。 Schlumberger作为承包商,需要一次完成曲线部分,通过软页面跑,并在超过3000米的磨料储层砂。巨大的挑战主要是在比特选择上,在曲线部分位的可操纵性和侵蚀性之间存在良好的平衡;同时在水平部分钻头的磨砂砂中实现最小3DEG / 30M DLS和耐久性。此外,有效的孔清洁和BHA稳定性还在成功交付井的关键作用。在与运营商的预先正式SQ研讨会之后,击中曲线的目标点并维持BHA在横向钻井中的转向能力将是优先级的问题,以保存运行并避免由于RSS工具转向故障与以前的偏移孔中以前的操作相似,避免NPT。与承包商钻探工程团队一起工作,并应用4D(3维+时间)FEA动态分析系统,我们能够提供高度定制和综合的提案包 - 包括推荐位,BHA设计和参数窗口,以克服挑战和优化钻井效率。 4D FEA动态分析系统能够以高精度模拟井下钻柱动态行为,包括位/ BHA轴向和横向振动,沿着BHA的杆滑移比和统计弯矩/应力分布。使用实验室测试的独特切割器 - 岩石交互数据,它提供了一个大型岩性目录,用于选择特定岩体与目标潜在岩性匹配,也能够互粘贴或子层仿真。 4D FEA系统已被用于确定预求拟提案中的位选择和参数窗口。我们的预先建议由运营商进行现场行动。如FEA分析所示,在曲线和水平腿上成功地满足了所需的DLS。在一个井中,录制的rop(> 8.6m / hr。)和长镜头钻(500米)取得了成功的递送。较好的井下钻弦稳定性稳定,助攻TD具有超过2000米的水平段长度,在整个西部土地上实现最长的水平腿。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号