首页> 外文会议>Abu Dhabi International Petroleum Exhibition Conference >A Field Applications of Effective Stimulation High Pressure/Temperature Multi-Stage Completion which Shows Significant Well Performance Improvement in Deep North Kuwait Jurassic Unconventional Reservoir
【24h】

A Field Applications of Effective Stimulation High Pressure/Temperature Multi-Stage Completion which Shows Significant Well Performance Improvement in Deep North Kuwait Jurassic Unconventional Reservoir

机译:有效刺激高压/温度多阶段完成的田间应用,显示出深北科威特侏罗纪非传统水库的显着良好良好的性能改善

获取原文

摘要

Selecting the completion design and stimulation technique in North Kuwait Jurassic Gas (NKJG) were critical to overcome reservoir challenges by stimulating these unconventional formations efficiently and effectively. Therefore, the completion design must be high-pressure rated upto 15,000 psi, high temperature of 275°F and sour service specified because of high H2S & CO2 content. These reservoirs are heterogeneous carbonate type with various productivity index due to existence of natural fracture which needs proper completion type that treat each reservoir layer separately. The most challenging factor in these unconventional reservoirs is the high permeability contrast among the different flow units because of the dual porosity effect which needs convenient diversion mechanism during the stimulation. The reservoir was segmented into different intervals to enhance the productivity index of each flow unit. For that reason, "High Rate Matrix Acidizing (HRMA)" method was obtained with retardard acid to restore the well productivity due to the drilling fluids which alter the effective permeability near the wellbore. By dividing each flow unit into separate stages across packer system and stimulate them subsequently is the aim to overcome high permeability contrast across the reservoir flow units. The Monobore Multi-stage was chosen as a completion type to produce from different zone of interest. These Reservoirs are divided into different stages and acid treated with various stimulation techniques (Acid fracturing & High Rate Matrix Acidizing). The success of the stimulation treatment in monobore Multi-stage completion depends on several factors such as: selecting proper fluid recipes, rock/fluid properties, job design, and field implementation. That type of completion is activated as a drop-ball system to stimulate each flow zone individually but in single well intervention setup. This paper presents a 15K open-hole HPHT MSC field success case application that describes the best practices, learning, planning, design, installation and stimulation in NKJG unconventional reservoirs to enhance well performance and overcome reservoir challenges. An improvement in understanding of production performance from several reservoir sections is the key enabler selective stimulation and effective testing. After stimulating all the stages milling of the ball seats of completion was obtained in order to pinpoint well production profile. The post stimulation flow tests results and production logs provided a good evidence for applying this technology these unconventional reservoirs.
机译:选择北科威特侏罗纪煤气(NKJG)的完井设计和刺激技术对于通过有效和有效地刺激这些非传统的构建来克服水库挑战至关重要。因此,完成设计必须高压额定高达15,000 psi,高温为275°F和由于H2S和CO2含量指定的酸性服务。这些储存器是由于存在自然骨折的存在性指数的非均相碳酸盐型,其需要单独处理每个储层层的适当完成类型。这些非常规储层中最具挑战性的因素是由于在刺激过程中需要方便的转移机制,因此不同流动单元之间的高渗透率对比。将储存器分段为不同的间隔,以增强每个流动单元的生产率指数。因此,用反应酸获得“高速率矩阵酸化(HRMA)”方法,以恢复由于钻井液而改变井筒附近有效渗透性的井生产率。通过将每个流动单元分成封隔器系统的单独阶段并随后刺激它们是克服储存器流量单元上的高渗透率对比的目的。选择单级多阶段作为完井类型,以产生来自不同的感兴趣区域。这些储层分为不同阶段和酸处理,用各种刺激技术(酸性压裂和高速速率基质酸化)。 Monofore多阶段完成的刺激治疗的成功取决于以下几个因素,例如:选择适当的流体配方,岩石/流体性质,工作设计和现场实施。这种类型的完成被激活为滴球系统,以单独刺激每个流量区,而是单独井干预设置。本文介绍了一个15k开放式HPHT MSC现场成功案例应用程序,描述了NKJG非常规储层中的最佳实践,学习,规划,设计,安装和刺激,以提高良好的性能和克服水库挑战。从多个储层部分的生产性能的理解改善是关键推动因素选择性刺激和有效测试。在刺激完成的所有阶段之后,获得了完成的球座椅,以便精确生产良好的生产曲线。刺激流动测试结果和生产日志提供了应用这项技术的好的证据,这些技术这些非常规储层。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号