首页> 外文会议>Abu Dhabi International Petroleum Exhibition Conference >Production Assurance of Oil Field by using Integrated Modeling
【24h】

Production Assurance of Oil Field by using Integrated Modeling

机译:通过综合建模生产油田的生产保障

获取原文

摘要

The Production Assurance Tool is developed to calculate the potential oil production from any field for different operational scenarios considering well potential and pipeline network limitations. This Tool represents integration between the pipeline hydraulic model and the performance of the production wells. The developed tool utilized PIPESIM software to model the pipeline network and Microsoft Excel as database for well performance in the format of lift curve, applying reservoir constraints and best reservoir management practices and as a general user interface for inputs and results. The programming script is performed by visual basic code to link PIPESIM with Microsoft excel to run number of iterations until the net system capacity is concluded. The challenges in each field determine the objective and configuration of the tool. The tool is being utilized extensively by COMPANY as an efficient, accurate and swift method to support strategic decisions related to net capacity of the field considering reservoir potential and pipeline network limitations. Examples of applications include optimizing plans of new wells, identification of production loss and possible areas for compensation for specific operational scenario. The tool is totally controlled by the designed general user interface with no physical interaction with the PIPESIM software and it can be easily updated with latest well lift curves and guidelines via COMPANY database, which is regularly updated by subsurface team. As being an In House Tool, it can be always updated and tweaked as required for different objectives. The tool provided an efficient methodology to fill the gap between reservoir performance and pipeline hydraulics by using available tools in the COMPANY with no extra investments and reduced the time required to conclude the feasibility and production optimization of different flow assurance scenarios.
机译:制定生产保证工具以考虑到潜在和管道网络限制的不同操作场景的任何领域计算潜在的石油生产。该工具代表了管道液压模型与生产井的性能之间的集成。开发工具利用Pipesim软件将管道网络和Microsoft Excel模拟作为数据库,以便以升力曲线的格式,应用储层约束和最佳库管理实践以及作为输入和结果的一般用户界面。通过Visual Basic代码执行编程脚本,以将PIPESIM与Microsoft Excel链接到运行迭代次数,直到终止系统容量结束。每个字段中的挑战决定了工具的目标和配置。该工具由公司广泛用于,作为一种高效,准确和快速的方法,以支持考虑水库潜力和管道网络限制的现场净容量相关的战略决策。申请的例子包括优化新井的计划,识别生产损失以及用于特定操作场景的补偿的可能区域。该工具完全由设计的一般用户界面控制,没有与Pipesim软件的物理交互,可以通过公司数据库使用最新的井升降曲线和指南轻松更新,该公司经常由地下团队更新。作为在房屋工具中,可以随时更新和调整不同目标所需的。该工具提供了一种有效的方法,可以通过使用公司中的可用工具填补储层性能和管道液压液的差距,没有额外的投资,并降低了结论不同流动保证情景的可行性和生产优化所需的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号