首页> 外文会议>Asian young geotechnical engineers conference >Estimation of railway ballast and subballast bearing capacity in terms of 300 kN axle load train operation
【24h】

Estimation of railway ballast and subballast bearing capacity in terms of 300 kN axle load train operation

机译:估计铁路镇流器和子柱承载力的300 Kn轴载列车运行

获取原文

摘要

The stated ballast and subballast bearing capacity calculation method allows to ensure track stable performance and optimize track lifecycle costs. The calculation method is based on limit equilibrium theory considering vibrodynamic impact and field test results of ballast stressed state and vertical and horizontal vibroaccelerations in ballast layer.
机译:所述镇流器和副蜂窝轴承能力计算方法允许确保跟踪稳定的性能并优化轨道生命周期成本。计算方法基于镇流器应力状态和横向和水平瓣膜络合的振动抗体冲击和现场测试结果基于极限平衡理论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号