首页> 外文会议>International Conference on Renewable Energies Offshore >Design analysis and installation of a large-scale composite bucket foundation for offshore wind turbine
【24h】

Design analysis and installation of a large-scale composite bucket foundation for offshore wind turbine

机译:近海风力涡轮机大型复合铲斗基础的设计分析与安装

获取原文

摘要

An application case is presented in details, which is the first and to date only large-scale Composite Bucket Foundation (CBF) (design loads according to 3.0 MW turbine) for a fully operational wind turbine installed at the offshore test facility in Qidong City, in the eastern part of China. The diameter and the bucket skirt length of the composite bucket foundation are equal to 30 m and 7 m respectively, and the total weight of the foundation is nearly 2400 tons with an 18 m arc transition structure of prestressed concrete. The key in the force transmission between the tower and the foundation for offshore wind turbine is to transfer the large moment and horizontal loads. The foundation with self-floating characteristics could be towed to the construction site and during installation is penetrated vertically into the soil by means of suction within the bucket with jetting at the bottom of bucket skirt.
机译:详细介绍了一个申请案例,这是一个安装在Qidong City的海上测试设施的全运行风力涡轮机的第一个和迄今为于大型复合桶基础(CBF)(根据3.0 MW涡轮机的设计负载),在中国的东部。复合铲斗基础的直径和铲斗裙子长度分别等于30米和7米,基础的总重量近2400吨,预应力混凝土的18米弧形过渡结构。塔架与海上风力涡轮机基础之间的力传输的关键是转移较大的力矩和水平载荷。具有自漂浮特性的基础可以牵引到施工现场,并且在安装过程中通过在铲斗裙的底部的喷射桶内垂直进入土壤。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号