首页> 外文会议>International Symposium on Aerodynamics, Ventilation and Fire in Tunnels >Development and implementation of performance metrics for operations and maintenance: Port of Miami tunnel project, a public private partnership
【24h】

Development and implementation of performance metrics for operations and maintenance: Port of Miami tunnel project, a public private partnership

机译:开发和实施运营和维护绩效指标:迈阿密隧道项目港,公共私人伙伴关系

获取原文

摘要

This paper will provide an overview of the concession agreement and payment mechanism structure, the tunnel facility and systems, and details regarding the development of the O&M plan criteria for the Port of Miami Tunnel project on behalf of the Florida Department of Transportation (FDOT). The paper will emphasize the development and application of the performance metrics used to determine availability of the tunnel, tunnel operating systems and the performance of the O&M services provider, including incident response, management of incidents, and maintenance. This paper will also discuss the application of supervisory control and data acquisition (SCADA) software for the tunnel systems operations including tunnel ventilation, management of incidents, determination of availability, and how the system data feeds back to the performance metrics and payment mechanism. The paper also will address the use of maintenance management software for the auditing of required maintenance activities.
机译:本文将概述特许协议和支付机制结构,隧道设施和系统,以及关于迈阿密隧道项目港的开发代表佛罗里达州的交通部(FDOT)的计划。本文将着重用于确定隧道的可用性性能指标,隧道操作系统和O&M服务提供商的性能,包括事件响应,事件管理和维护的开发和应用。本文还将讨论监督控制和数据采集(SCADA)软件为隧道系统操作的应用,包括隧道通风,事件管理,可用性的确定以及系统数据如何返回性能度量和支付机制。本文还将解决维护管理软件的使用,以审计所需的维护活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号