首页> 外文会议>SPE Russian Oil Gas Exploration and Production Technical Conference >Use of Channel Fracturing Technology Increases Production and Reduces Risks in Horizontal Wellbore Completions. First Experience in Russia, South-Priobskoe Oil Field
【24h】

Use of Channel Fracturing Technology Increases Production and Reduces Risks in Horizontal Wellbore Completions. First Experience in Russia, South-Priobskoe Oil Field

机译:使用渠道压裂技术的使用增加了生产,减少了水平井筒完井中的风险。俄罗斯的第一次经验,南普里比斯油田

获取原文

摘要

South-Priobskoe field is in process of active development for over 10 years at the moment. Main producing horizons are low-permeable sandstone formations AS10-AS12 of Neocomian age. Hydraulic fracturing in the vertical wells proved to be effective way to increase oil production and provided profitable development of the oil field for several years period. Many wells had commingled production from 2 or 3 layers; each of the layers was stimulated separately. However, recent shift of drilling and development activity towards edge areas of the field led to reduction in formation quality and seldom well intersects more than one productive interval nowadays. Most effective way for such geological conditions is combination of horizontal well drilling development and multi-stage fracturing. This concept was successful applied worldwide for number of years and recently fulfill expectation at South Priobskoe field in Russia as well. Enhancement of oil production jointly with drainage scheme optimization allowed to decrease amount of wells and associated costs for infrastructure and well completion. Main weaknesses of this approach are increased screenout risks during fracturing operation and additional costs for horizontal wellbore cleanout in such a case. Implementation of channel fracturing technology became the next step of production optimization and well completion cost reduction. New method allows increasing reliability of proppant placement while improving fracture conductivity. These results are obtained by pulsing proppant on surface in conjunction with specialized equipment and fibers. New technology was implemented in 110 vertical wells over Russia including positive experience of channel fracturing campaign in 3 wells in South-Priobskoe field. This article describes Russia’s first project of multistage stimulation (MSS) combined with channel fracturing technique applied in horizontal well. New approach allowed minimizing screenout risk, reducing completions costs and at the same time improving conductivity of hydraulic fractures. First production results showed increase in well productivity of over 15% compared to the neighboring horizontal wells stimulated by conventional MSS technique.
机译:南普里比斯科田现场正在积极开发,此时已有10多年。主要生产视野是新科常客年龄为10-AS12的低渗透砂岩地层。液压压裂在垂直井中被证明是提高石油生产的有效途径,并提供了几年的油田的盈利发展。许多井已经从2层或3层混合制作;分别刺激每个层。然而,近期钻孔和开发活动的转变对现场的边缘区域导致形成质量的降低,并且现在很少相交多于一个生产间隔。这种地质条件的最有效方法是水平井钻井开发和多阶段压裂的组合。这一概念在全球范围内取得了成功,多年来,最近在俄罗斯的南普里波斯田上达到预期。利用排水方案优化共同提高石油生产,允许减少井和基础设施的相关成本。这种方法的主要弱点是在压裂操作期间增加屏幕外风险以及在这种情况下的水平井筒清洁的额外成本。渠道压裂技术的实施成为生产优化的下一步,井完成成本降低。新方法允许提高支撑剂放置的可靠性,同时提高裂缝电导率。这些结果是通过与专用设备和纤维的表面上的表面上的支撑剂获得。新技术在俄罗斯的110个垂直井中实施,包括南普里波斯田田中的3个井的渠道压裂运动的积极体验。本文介绍了俄罗斯的第一级刺激(MSS)项目与水平井的渠道压裂技术相结合。新方法允许最大限度地减少屏幕外风险,降低完成成本,同时提高液压骨折的电导率。与传统MSS技术刺激的相邻水平孔相比,第一生产结果显示出超过15%的良好生产率超过15%。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号