首页> 外文会议>International Conference on Materials, Transportation and Environmental Engineering >Diversion Scheme for Yuliang Hydro-junction Project of Youjiang River in Construction Period
【24h】

Diversion Scheme for Yuliang Hydro-junction Project of Youjiang River in Construction Period

机译:乌江江江宇良水电枢纽工程转移方案

获取原文

摘要

Determination of construction diversion scheme is the most important part in the hydro-junction engineering design of inland waterway, which will influence the general layout, construction time and total cost. Based on the method of combining remote-controlled self-propelled ship model test with physical model test, the velocity and flow pattern of diversion channel in the first construction period, navigation flow condition of temporary channel, the velocity and flow pattern of release sluice and the navigation flow condition during the second construction period were analyzed in this paper. The problems in the construction diversion scheme were studied, and the improve measures which could meet the requirement for navigation and diversion were proposed.
机译:建筑转移方案的确定是内陆水道水电联合工程设计中最重要的部分,这将影响一般布局,施工时间和总成本。基于与物理模型试验的远程控制自推进船模型测试,在第一施工时期中转移频道的速度和流动模式,临时通道的导航条件,释放闸的速度和流动模式及在本文中分析了第二施工期间的导航流动条件。研究了建设转移方案中的问题,提出了提高可达到导航和转移要求的措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号