PROACTIVE CONSTRUCTION NOISE CONTROL POLICIES DEVELOPED FOR THE CENTRAL ARTERY/TUNNEL PROJECT’S C17A6 CONTRACT

机译:为中央动脉/隧道项目开发的主动建筑噪声控制政策C17A6合同

获取原文

摘要

The Central Artery/Tunnel Project (The Big Dig) in Boston is the most ambitious urban construction project ever undertaken in the United States. One of the most politically-charged challenges that the project has had to successfully manage involves noise. Fortunately, lessons learned through almost 10 years of construction to date served well towards developing proactive noise mitigation policies for the project=s final remaining contract [1]. The C17A6 contract will finish about 2 miles of tunnels and surface roadways through downtown Boston, and will demolish and remove the existing elevated I-93 Artery. In preparation, project staff met as early as 1998 with design and environmental engineers, as well as community and City representatives in order to devise mutually acceptable policies towards mitigating C17A6-related noise. Comprehensive noise prediction studies were performed, candidate noise control options were developed, and costs were considered. Eventually, a series of noise mitigation measures, totaling about $3 million, were approved for inclusion in the C17A6 contract. These measures included equipment restrictions at night, noise barriers and curtain systems, acoustical window treatments, prohibition of backup alarms at night, and continued oversight with dedicated noise technicians. With these measures committed to the public, the C17A6 contract went out to bid in April 2001 at an estimated price of $440 million.
机译:波士顿中央动脉/隧道项目(Big Dig)是最雄心勃勃的城市建设项目。该项目必须成功管理的最受政治挑战之一涉及噪音。幸运的是,迄今为止迄今为止近10年的建设的经验教训良好地为项目的积极噪音缓解政策进行了良好的服务= S最终剩余合同[1]。 C17A6合同将通过波士顿市中心完成约2英里的隧道和地面巷道,并将拆除并拆下现有的I-93动脉。在准备工作中,项目员工早在1998年与设计和环境工程师举行会议,以及社区和城市代表,以制定互动可接受的政策,以减轻C17A6相关的噪音。进行全面的噪声预测研究,开发了候选噪声控制选项,并考虑了成本。最终,一系列噪音缓解措施总额约为300万美元,批准纳入C17A6合同。这些措施包括夜间,隔音障碍和窗帘系统的设备限制,声学窗口处理,夜间禁止备用报警,并与专用噪声技术人员继续监督。随着这些措施致力于公众,C17A6合约于2001年4月出价,估计价4.4亿美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号