Environmental impact assessment of hydroelectric project 'Santuario 20' located in Sumapaz river basin

机译:水电项目的环境影响评估“Santuario 20”位于萨满河流域

获取原文

摘要

The Hydroelectric Project Santuario 20 is located between the towns of Icononzo and Pandi, in the departments of Tolima and Cundinamarca respectively. The project consists to get water of the Sumapaz river, which will be transported through a tunnel driving on a stretch of about 6.4 Km, its returned back into the river at a point downstream. At the last section of tunnel it will install the pressure line and then roundhouse, where power generation infrastructure will be available. Since 2008, the company EMGESA SA E.S.P. has applied to the Ministry of Environment, Housing and Territorial Development initiate the administrative procedure of environmental permit since the magnitude of the project is large scale; for this, the company EMGESA has made the past year socialization of the project to the community. However in the population and the mayors of these municipalities, is not clear the environmental involvement and the real benefits that this work will bring to people living in these municipalities, considering that the energy produced in the hydraulic unit will not be used in this region, this energy will be exported. In order to issue, a technical concept from the environmental point of view without conflict of interest is necessary, in this research was done the Environmental Impact Assessment of the area of influence of the project. We were used qualitative tools such as surveys and quantitative tools such as the matrix index of environmental significance, in which it was observed that affected components in the construction, commissioning and maintenance of the project and with very high environmental importance were: wildlife, hydrology and socio-economic component.
机译:Santuario 20水电项目分别位于Tolima和Cundinamarca的部门的Icononzo和Pandi之间。该项目组成了萨巴兹河的水,将通过隧道驾驶的隧道运输,延伸约6.4公里,在下游的点返回河流。在隧道的最后一部分,它将安装压力线,然后将供电基础设施可用。自2008年以来,公司Emgea Sa E.P.已申请环境部,住房和领土发展发起环境许可证的行政程序,因为该项目的规模大规模;为此,公司Emgesa已将前一年的项目社区社会化。然而,在这些城市的人口和市长,不清楚的环境参与和这项工作将为生活在这些城市的人们的真正福利,考虑到液压单位生产的能量不会在该地区使用,这种能量将出口。为了发布,从环境观点来看,在没有利益冲突的情况下是必要的,在这项研究中是对项目的影响领域进行了环境影响评估。我们被使用的定性工具,如调查和定量工具,如环境意义的矩阵指标,其中观察到该项目的建设,调试和维护以及具有非常高的环境重要性的影响:野生动物,水文和社会经济部件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号