首页> 外文会议>International Conference on Civil, Architectural and Hydraulic Engineering >Analysis on the Process of Flow-Sediment in Jianli Reach of Yangtze River before and after the Construction of Three Gorges Project
【24h】

Analysis on the Process of Flow-Sediment in Jianli Reach of Yangtze River before and after the Construction of Three Gorges Project

机译:三峡工程施工前后长江建雷坑流量分析

获取原文

摘要

Jianli Reach has long been exposed to labile main flow and the frequent translocation between the main channel and the lateral branch. To investigate how the long-term process of flow-sediment influences the adjustment of river channel pattern, monthly time series (1951-2009) of runoff and sediment load at Jianli hydrological station of Yangtze River were analyzed using three methods: R/S analysis to estimate Hurst exponent, Mann-Kendall method and the time series anomaly analysis. The result shows that on 1 year time scale, the values of Hurst exponent are indicating persistence, that is to say, the trend of runoff and sediment in the future will generally be the same as the past, and the persistence in runoff series is stronger than that in the sediment load. The period of oscillation in annual runoff and in sediment load is about 30 years. The result of Mann-Kendall test shows an abrupt change point of runoff time-series at 1967 and an abrupt change point of sediment load time-series at 2003. And during the flood season, the values of Hurst exponent still indicate persistence, which is weaker than that in whole year correspondingly.
机译:监利覆盖率早已暴露于不稳定的主要流和所述主通道和侧分支之间的频繁的易位。研究如何使用三种方法径流泥沙的河道图案,每月的时间系列(1951年至2009年)中的长江监利水文站调整分析水沙影响的长期过程:R / S分析估计Hurst指数,曼 - 肯德尔法,时间序列异常分析。结果表明,1年的时间尺度,Hurst指数的值表明持久性,也就是说,径流和泥沙在未来的走势通常是一样的过去,并在径流系列的持久性更强比在泥沙。振荡的年径流量和输沙量的周期为30年左右。的曼 - 肯德尔测试表明,在1967年径流时间序列的突变点,并在2003年和汛期输沙量时间序列的突变点,结果,Hurst指数值仍显示持久性,这是比全年相应较弱。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号