首页> 外文会议>International Conference on Energy, Environment and Sustainable Development >Study on the Insulation Coordination of ±800kV Converter Station in the Nuozhadu to Guangdong HVDC Power Transmission Project
【24h】

Study on the Insulation Coordination of ±800kV Converter Station in the Nuozhadu to Guangdong HVDC Power Transmission Project

机译:糯800kV换算站在糯800kV转换站对广东高压钢铁电力传输项目的研究

获取原文

摘要

It is very important to study the overvoltage protection and insulation coordination of the converter stations for the ±800kV UHVDC transmission project because of its importance in the power grid. The paper studies two kinds of arrester arrangements of the converter stations in the Nuozhadu to Guangdong ±800kV UHVDC power transmission project by using the PSCAD/EMTDC program. The simulation results show that the protective level of arresters is different, while the insulation levels of critical equipments in the converter station are almost the same under these two arrester arrangement schemes.
机译:由于其在电网中的重要性,研究转换器站的过电压保护和绝缘性协调是非常重要的。本文采用PSCAD / EMTDC程序研究了纽诺·南省糯南±800kV UHVDC电力传输项目的两种避雷器安排。仿真结果表明,避雷器的保护水平是不同的,而在这两个避雷器布置方案下,转换器站中的关键设备的绝缘水平几乎相同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号