Discussion and Realization on Quality Control Methods of Power Steam Turbine-generator Unit Installation

机译:电力汽轮发电机单元安装质量控制方法的探讨与实现

获取原文

摘要

Based on the practical experience of turbine unit installation, combined with the project quality management theory, analyzed the impact factors of turbine installation quality, explored the quality control content, and formed a more perfect of quality control methods system ultimately. The application of the methods in the SDIC Power Plant team turbine unit installation achieved the good results, and it became the reference for the same or related industry.
机译:基于涡轮机组安装的实践经验,结合项目质量管理理论,分析了涡轮机安装质量的影响因素,探索了质量控制内容,并形成了更完善的质量控制方法系统。该方法在SDIC电厂团队涡轮机组安装中的应用达到了良好的效果,并成为相同或相关行业的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号