首页> 外文会议>International Conference on Non-Conventional Materials and Technologies >Hysteresis Analysis on Beam-Column Connection of Concrete-filled Steel Tubular Structure under Cyclic Loading
【24h】

Hysteresis Analysis on Beam-Column Connection of Concrete-filled Steel Tubular Structure under Cyclic Loading

机译:循环载荷下混凝土钢管结构梁柱连接的滞后分析

获取原文

摘要

The concrete-filled steel tubular structure is widely used in practices, as it shows perfect seismic performances such as ductility, and has strong ability of collapse under seismic loading. In this paper, firstly, the stiffness damage and stiffness recovery parameters of concrete constitute model under cyclic loading was calibrated and verified by examples. Then the finite element model was verified by numerical examples of reinforce concrete members and concrete-filled steel tubular members. At last, on the base of the result of analysis and verification, the hysteresis curves on beam-column connection of concrete-filled steel tubular structure under cyclic loading were simulated and compared with experimental results, and the hysteresis characters was analyzed in the end.
机译:混凝土钢管管结构广泛应用于实践,因为它显示出完美的地震性能,如延展性,并且具有抗震载荷下塌陷的强大能力。本文首先,校准了循环载荷下混凝土构成模型的刚度损伤和刚度恢复参数,并通过实施例验证。然后通过钢筋混凝土构件和混凝土钢管状构件的数值示例来验证有限元模型。最后,在分析和验证结果的基础上,模拟了在循环加载下混凝土钢管结构的束柱连接上的滞后曲线,并与实验结果进行了比较,最后分析了滞后特征。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号