首页> 外文会议>SREE Workshop on Applied Mechanics and Civil Engineering >Study on Mass Concrete Slab Construction Technology of Dalian World Finance Center
【24h】

Study on Mass Concrete Slab Construction Technology of Dalian World Finance Center

机译:大连世界金融中心大规模混凝土板施工技术研究

获取原文

摘要

Through the research on the mass concrete slab construction technology of Dalian World Finance Center, this paper has systematically summarized the integrated construction technology of super high-rise mass concrete slab, including key issues such as mix design technology, pouring time selection, construction elements and temperature testing technology. The one-time continuous pouring of 8000m~3's concrete requires about 66 hours and no temperature cracks appear in the concrete surface. A number of similar engineering practices indicate that the maximum adiabatic temperature rise is mainly subjected to the control of concrete mix composition and internal and the temperature difference between inside and outside is mainly controlled by the moisture and insulation measures, which are the two major critical factors controlling mass concrete slab temperature cracks, providing references to future similar mass concrete construction.
机译:通过研究大连世界金融中心的大规模混凝土板施工技术,本文系统地汇总了超高层质量混凝土板的综合施工技术,包括混合设计技术,浇注时间选择,建筑元素等关键问题温度测试技术。每次连续浇注8000m〜3的混凝土需要大约66小时,混凝土表面上没有温度裂缝出现。许多类似的工程实践表明,最大绝热升高主要是对混凝土组合物的控制,内外的内外温差主要受到水分和绝缘措施的控制,这是两个主要关键因素控制质量混凝土板温度裂缝,提供对未来类似大规模混凝土结构的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号