首页> 外文会议>International Conference on Civil Engineering, Architecture and Building Materials >Instability Mechanism of Surrounding Rock for Super-Large Cross Section at High-speed Railway Tunnel Portal
【24h】

Instability Mechanism of Surrounding Rock for Super-Large Cross Section at High-speed Railway Tunnel Portal

机译:高速铁路隧道门户网站超大横截面周围岩石的稳定机理

获取原文

摘要

Difficulties of tunnel construction mainly appear in the entrance and exit stage, some adverse geological problems may occur. In terms of the tunnel at the Changsha-Kunming section of the Shanghai-Kunming passenger line, firstly, adverse geological phenomena at tunnel exits was described. Secondly, major factors leading to disasters were listed, including geology, hydrology and construction procedure. Combined with in-situ conditions, Finite Element Method (FEM) was used to analyze the instability mechanism of surrounding rock after the upper arch gate was excavated by three-bench seven-step exaction method. At last, through comparison between computed result and measuring data, several basic conclusions was obtained. It can make much sense to similar engineering.
机译:隧道施工的困难主要出现在入口和出口阶段,可能发生一些不利的地质问题。在上海 - 昆明乘客线的长沙 - 昆明段的隧道方面,首先,描述了隧道退出处的不利地质现象。其次,列出了导致灾害的主要因素,包括地质,水文和施工程序。结合原位条件,有限元法(FEM)用于通过三个台阶七步缩回法在上拱门挖掘出上拱门之后的周围岩石的不稳定机制。最后,通过计算结果与测量数据之间的比较,获得了几个基本结论。它可以对类似的工程进行很大的意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号