首页> 外文会议>International Conference on Green Building, Materials and Civil Engineering >Whole-process Analysis of the Mechanical Responses of High Formwork Support Systems During Concrete Pouring
【24h】

Whole-process Analysis of the Mechanical Responses of High Formwork Support Systems During Concrete Pouring

机译:混凝土浇注中高模板支撑系统机械响应的全过程分析

获取原文

摘要

An underground club in Xi'an is taken as the research object to explore the mechanical response of the internal poles of its high formwork support system during concrete pouring. The internal force static measurement of the high formwork support system is carried out. Each stage of the concrete pouring is simulated by the finite element analysis software ANSYS in the form of load step, whose results are contrasted with the measured results. The contrast reveals that the concrete pouring sequence has direct influence on the tendency of poles' axial force and on the location of maximum axial force and that it is reasonable to adopt imaginary horizontal force which simulates the initial defects to carry out the overall stability analysis of the high formwork support system. It is pointed out that the program of setting up the formwork and the concrete pouring sequence should be determined with the finite element analysis.
机译:西安的地下俱乐部被视为研究对象,以探讨其高模板支持系统在混凝土浇注过程中的内部极点的机械响应。执行高模板支持系统的内部力静态测量。混凝土浇注的每个阶段由负载步骤的有限元分析软件Ansys模拟,其结果与测量结果形成鲜明对比。对比度表明,混凝土浇注序列对杆子轴向力和最大轴向力的位置具有直接影响,并且采用模拟初始缺陷来执行初始缺陷的虚线水平力是合理的高模板支持系统。指出,应使用有限元分析确定设置模板和混凝土浇注序列的程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号