首页> 外文会议>Corrosion Conference and Expo >Sub-sea SCR/Flowline Preservation - Maintenance of Fill Fluids During the Thunder Horse Sub-sea Kit Re-installation Campaign
【24h】

Sub-sea SCR/Flowline Preservation - Maintenance of Fill Fluids During the Thunder Horse Sub-sea Kit Re-installation Campaign

机译:亚海SCR / Flowline保存 - 在雷马海上海上套件重新安装活动期间维护填充液

获取原文

摘要

This paper will summarize the activities undertaken by the Thunder Horse Sub-sea Team in the maintenance of the hydrotest-fill fluids for the sub-sea production flow-line/equipment from initial fill until start-up. Discussed will be:-The initial fill of the Thunder Horse sub-sea system with chemically treated water and how this treatment aligned with BP and MMS/EPA requirements. -The position that the project team took as related to the continued effectiveness of the chemically treated fill fluids, particularly with respect to the degradation of the biocide product (THPS) and its ability to mitigate the effects of microbial influenced corrosion (MIC), over extended periods leading to production start-up. -The activities performed by the Thunder Horse project team to maintain the recommended chemical concentrations in the sub-sea system during construction activities.
机译:本文将总结雷马亚海队伍在维护Sublotest-Fills的次海生产流量/设备维护中,从初始填充到启动。讨论将是: - 用化学处理水的雷马亚海系统初始填充,并将这种治疗与BP和MMS / EPA要求对齐。 - 项目团队与化学处理过的填充流体的持续有效性相关的位置,特别是关于杀生物剂产品(THP)的降解及其减轻微生物影响腐蚀(MIC)的影响的能力延长期限导致生产启动。 - 雷马工程组成的活动在施工活动期间维持亚海系统推荐的化学浓度。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号