首页> 外文会议>SPE International Symposium and Exhibition on Formation Damage Control >High-Rate Gas Well Completions in Egypt's Mediterranean Sea: Tao Field Development Strategy and Case Histories
【24h】

High-Rate Gas Well Completions in Egypt's Mediterranean Sea: Tao Field Development Strategy and Case Histories

机译:埃及地中海的高速燃气井完井:陶场开发战略和病例历史

获取原文

摘要

TAO field is a high rate gas development in the Mediterranean Sea, operated by North Sinai Petroleum Company (NOSPCO), a joint venture of Perenco and EGPC. The field comprises multichannel sandstone reservoirs from the Nile Delta depositional environment. Earlier exploration and appraisal stages had proven reserves for three of the six sands, with the remaining three identified as potential (unconfirmed) gas bearing reservoirs, all of which require sand control. A multidisciplinary project team put forward and implemented a field development plan to maximize profitability through effective measures for overall cost reduction, while ensuring sustained delivery of the production commitment. This paper will detail the field development plan, implementation and results, along with the case histories. This plan included: ·Batch drilling and batch completion to minimize drilling and completion costs, and maximize data gathering as early as possible. ·Completing two of the four wells as openhole gravel packs targeting the most prolific sand to ensure that the production target is met with the productivity benefit of an openhole completion and reliability of gravel packing as a sand control technique. ·Completing the remaining two wells as cased hole gravel packs in squeeze mode to increase well productivity by ensuring maximum amount of gravel behind casing and targeting the two remaining sands with proven reserves as well as the sands with potential reserves in order to sustain the production commitment over project life, while avoiding to drill two dedicated appraisal wells. All gravel packs were performed with filtered seawater as the base brine and mesh type sand control screens, with the exception of one of the zones, where alternate path screens were used in conjunction with a seawater compatible viscoelastic surfactant carrier fluid. Openhole gravel packs utilized a service tool that allowed post-gravel-pack filtercake cleanup treatment. Post completion multi-rate tests concluded that both openhole gravel pack wells fulfilled the required productivity, showing potential productivity above 110 MMSFCD per well. In addition, the two of the zones tested in each of the cased-hole gravel packs showed potential productivity above 50 MMSCFD per zone.
机译:陶领域是地中海的高利率天然气开发,由北西奈石油公司(NOSPCO),Perenco和EGPC的合资企业运营。该领域包括来自尼罗河三角洲沉积环境的多通道砂岩储层。早期的勘探和评估阶段已经证明了六个沙子中的三个储备,其余三个被确定为潜在(未经证实的)燃气储存器,所有这些都需要砂控制。多学科项目团队提出并实施了一个现场开发计划,通过有效措施来实现盈利能力,以便确保持续交付生产承诺。本文将详细介绍现场开发计划,实施和结果以及案例历史。本计划包括:·批量钻探和批量完成,以尽量减少钻井和完成成本,并尽早最大化数据收集。 ·以瞄准最丰富的沙子的透露砾石包完成四个井中的两个井,以确保符合生产目标的遮光器完成和砾石填料的可靠性作为砂砾控制技术。 ·在挤压模式下完成剩余的两个井,因为挤压模式中的套管砾石包通过确保壳体后面的最大砾石,并瞄准具有经过验证的储备以及具有潜在储备的砂岩的两个剩余砂,以维持生产承诺超过项目生活,同时避免钻取两个专用评估井。除了一个区域之外,通过过滤的海水和网状砂对照屏幕进行所有碎片包,其中一个区域除外,其中交替的路径筛网与海水相容的粘弹性表面活性剂载体一起使用。 OpenHole砾石包装使用允许碎片覆盖滤饼清理处理的服务工具。完成后的多速测试的结论是,透露砾石包装井井满足所需的生产率,显示出每孔110毫米效率高于110毫米的生产率。另外,在每个套管砾石组中测试的两个区域显示出潜在的生产率高于50 mmscfd的每个区域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号