首页> 外文会议>DISTRIBUTECH Conference Exhibition >Stanley Works - Helping Meet ISO-NE Capacity Needs - In Every Way Possible
【24h】

Stanley Works - Helping Meet ISO-NE Capacity Needs - In Every Way Possible

机译:斯坦利作品 - 帮助符合ISO-NE容量的需求 - 以各种可能的方式

获取原文

摘要

In late 2006, Stanley Works, a producer, manufacturer and marketer of top-quality tools, was contacted by ConsumerPowerline to enroll its Connecticut manufacturing facilities in demand response programs offered by the Independent System Operator of New England (ISO-NE). ISO-NE, as part of its commitment to promoting regional grid sustainability, offers programs that provide significant financial incentives for end users of electricity to curtail -- or reduce -- their electricity during times of electric grid stress, high electricity prices or emergency situations. These range from programs that require participants to curtail within 30 minutes of notification, to a Demand Response Reserves program, currently in its pilot phase, which requires participants to curtail within 10 minutes, but has much shorter events.
机译:2006年底,斯坦利工程,生产者,制造商和营销人员和高质量工具的营销人员都是由ConsumerPowerLine联系的,以便在新英格兰(ISO-NE)的独立系统运营商提供的需求响应方案中注册其康涅狄格州制造设施。作为其促进区域网格可持续性的承诺的一部分,提供了为延迟电力的最终用户提供重大财务激励的计划 - 或减少电网压力,电网压力,高电价或紧急情况的电力。这些范围从需要参与者在通知后30分钟内缩减的程序,以便响应答复计划,目前在其试验阶段,这需要参与者在10分钟内缩减,但事件较短。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号