首页> 外文会议>International Conference of Architecture and Technology >A Case Study on Management Process of Building Commissioning for a New Building in Hong Kong
【24h】

A Case Study on Management Process of Building Commissioning for a New Building in Hong Kong

机译:香港新建筑建设调试管理进程案例研究

获取原文

摘要

Buildings are essential as they are places where people accommodate their living and business.Financially, buildings are real estates and their values are usually reflected directly on business and personal accounting statements. For health and safety issues, building provides a hygienic and safe living environment. Therefore, quality buildings are very important in modem world. The term, "commissioning"(Cx)is derived from ship-building industry.It is conventionally viewed as a stage to make building services installations to function as intended. The interpretation on commissioning from US and Britain are quite different. The former model demands commissioning as a quality control process throughout planning, design, construction, acceptance and post-acceptance phases;the latter demands a validation process that makes the installations work to design intent. In this paper, management process on commissioning of a new building in Hong Kong was examined. The management and documentation on the commissioning process are also compared with those guidelines recommended by professional institutions.
机译:大楼是必不可少的,因为他们是人们容纳他们的生活和商业的地方。金融,建筑物是真正的庄园,他们的价值观通常直接反映在商业和个人会计报表上。为了健康和安全问题,建筑提供卫生和安全的生活环境。因此,质量建筑在Modem World中非常重要。该术语“调试”(CX)来自船舶建设行业。通常被视为制作建筑物服务按预期运行的阶段。对美国和英国调试的解释是完全不同的。前模型要求在整个规划,设计,施工,验收和接受阶段进行质量控制过程;后者要求进行验证过程,使设备成为设计意图的工作。本文研究了香港新建筑调试的管理进程。还与委托过程的管理和文件与专业机构建议的指导方针进行了比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号