首页> 外文会议>PALENC Conference on Building Low Energy Cooling and Advanced Ventilation Technologies in the 21st Century >Methodology and results of construction company RD department in energy efficiency in building
【24h】

Methodology and results of construction company RD department in energy efficiency in building

机译:建设公司研发部在建筑能源效率下的方法论和结果

获取原文

摘要

To promote the sustainability the building environment is full of opportunities; in particular in Europe with the energy building performance directive and its adaptation in Spain with the new regulation on energy efficiency in building (Codigo Tecnico de la Edificacion: CTE). The work on energy efficiency in building could be held since different point of view. In a construction company it exists 2 ways to encourage energy savings: 1. Studying the basic project during the phase of competition. This approach lets few time and just permits to give advice but they might be not applied at the executionstage. 2. Analysing the project at the beginning of the work phase. The clients, most of the time, approve some modifications during the execution of the building. So, the changes to save energy can be consented with the approbation of the architects. The studies follow a logical plan: the analysis of the projected design, the analysis of different more energy efficient solutions and the economical-energetic study of these proposed solutions. To make the energetic analysis, simulation softwares are used.
机译:为了促进可持续性,建筑环境充满了机会;特别是在欧洲,能源建设绩效指令及其在西班牙的适应与建设中的能源效率的新规定(Codigo Tecnico de La Edficion:CTE)。自不同的观点以来,可以举行建筑能效的工作。在建筑公司中,它存在两种鼓励节能的方式:1。在竞争阶段的基础项目中研究基础项目。这种方法让时间几个时间,只是允许提供建议,但它们可能不会在刽子手时应用。 2.在工作阶段开始分析项目。大多数时候,客户端,在执行建筑物期间批准了一些修改。因此,可以通过建筑师的认可来拯救能源的变化。研究遵循逻辑计划:分析预计设计,分析了不同节能解决方案的分析与这些提出的解决方案的经济实惠研究。为了使能量分析,使用仿真软件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号